Operating Instructions For Power Supplies - REO 32734 User And Operational Manual

Visible wavelength helium-neon laser system
Table of Contents

Advertisement

Research Electro-Optics (REO) certifies that our laser heads and lab power supplies meet the
appropriate CE requirements. For the CE regulations to be met, all lab power supplies must be
used with an input line cord with a length of less than 3 meters.
The below symbol on the product or on its packaging indicates that this product must not be
disposed of with regular waste. It is the user responsibility to dispose of waste equipment
according to the local laws. The separate collection and recycling of the waste equipment at the
time of disposal will help to conserve natural resources and ensure that it is recycled in a manner
that protects human health and the environment. For further information about where the user
can drop off the waste equipment for recycling, please email REO at:

OPERATING INSTRUCTIONS FOR POWER SUPPLIES

The power supply is key switch operated. It incorporates all of the appropriate safety features
required by international regulations.
Figure 3: Front Panel of Power Supply
henelaser@reoinc.com
REF-177
.
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents