Hanil HyperCOOL HC3055 Operation Manual page 11

Table of Contents

Advertisement

3. Installation
3.3 HyperCOOL Connection
[HyperCOOL as a 'Freezer Dryer']
[Preparation of Chamber]
1. Ensure all the vacuum valves are firmly closed.
2. Ensure all the connections and attachment from the chamber are tightly sealed.
3. Ensure the drain valve does not contain any water.
4. Ensure both the drain valve and the vacuum release valve are fully closed.
5. Check the status of all the rubber valve handles are closed.
Close
[Preparation of Vacuum Pump]
1. Connect vacuum hose to the vacuum pump inlet and firmly clamp it not to
release vacuum.
2. Connect vacuum hose to the HyperVAC vacuum nozzle and firmly clamp it.
[Preparation of Accessories]
1. Chamber or manifold should be mounted on top of HyperCOOL for freeze-drying
samples.
2. Ensure all the connections are tightly sealed.
Technical Support : +82-2-3452-8966 / techsupport@ihanil.com
Opened
Vacuum Release
11/26

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Hanil HyperCOOL HC3055

This manual is also suitable for:

Hypercool hc3110

Table of Contents