3. Enter the address sender and recipient's SMS notification addresses..
4. Check the radio button to either use the event or to create a custom subject for the email.
5. Enter the SMTP server and port number.
6. Click the Authentication checkbox to enable the subsequent fields.
7. Enter a username and then click the Password checkbox to enable the Modify Password field.
8. Enter a new password in the Modify Password field.
9. Choose the Connection Type from the drop-down list box.
10. Click the Save icon at the upper-left of the window.
11. To verify the SMS configuration, click the Verify SMS icon in the upper-left of the window.
Customize Message
An administrator can customize an email or SMS message as well as configure emails and SMS event consolidation.
To customize a message:
1.
From the side navigation bar of the System tab, click Notification - Messaging - Customize Message.
2. Under the Customize Message heading, check the items to be included for email and/or SMS messaging.
3. Click the Save icon.
To configure e-mail and SMS event consolidation:
1.
From the side navigation bar of the System tab, click Notification - Messaging - Customize Message.
2. Under Configure Email/SMS Event Consolidation, check the boxes to enable email or SMS consolidation.
3. Enter the consolidation time limit using the number of seconds and enter the consolidation event limit in
number of events.
4. Click the Save icon in the upper-left corner of the window.
Syslog
Syslog notifications can be sent to up to four IPv4 or IPv6 addresses.
To enable Syslog notifications:
1.
Log in with the required privileges.
2. From the side navigation bar of the System tab, click Notification - Syslog.
3. Check the box to enable either IPv4 or IPv6 addressing and enter up to four addresses.
4. Click the Save icon.
Datalog
An administrator can enable data logging for rack PDUs, branches or receptacles, and export the data log to an FTP site.
To enable data logging:
1.
Log in with the required privileges.
2. From the side navigation bar of the System tab, click Notification - Datalog.
3. Under the Datalog heading, check the box to enable data logging.
4. Use the drop-down menus to enable or disable PDU, branch or receptacle data logging.
5. Use the drop-down menu to enter the data logging interval using the number of minutes.
6. Click the Save icon.
To export a data log:
1.
From the side navigation bar of the System tab, click Notification - Datalog.
2. Under the Export heading, enter the IP address, username and password for the FTP site to receive the data
log.