Step 10. Connect Power And Test; Make Sure That All Cables Are Connected; Check Cable Connections - Globalstar GSP-2800 Installation Manual

Fixed satellite phone
Hide thumbs Also See for GSP-2800:
Table of Contents

Advertisement

Step 10. Connect power and test

Make sure that all cables are connected

Note
Do not supply power to the RAU or components until all the
steps of assembly are complete. Use the following checklist to
ensure that assembly is complete.
❑ Is the RAU mounted securely?
❑ Does the antenna have a clear, unobstructed view of the sky and
the horizon in all directions?
❑ Is the junction box mounted on the outside wall?
❑ Are all inside wires located inside the building?
❑ Are only outside cables used on the outside of the building?
❑ Is the wiring for the building complete and tested?
❑ Are all cables and jacks correctly connected and in place?
❑ Are all cables tied down?
❑ Do a visual check. Does everything appear to be in order?
❑ Are telephones and their wiring installed?
❑ Make corrections as needed.

Check cable connections

In addition, be sure the following are done correctly.
The RAU and the junction box are properly grounded.
The junction box is installed.
The RAU is connected to the junction box and the P clip inside
the access cover of the RAU is tightened down.
The power supply is installed (follow instructions provided with
the power supply, if any).
The 12 volt power wires are run to the power source.
The inside wiring is installed for the telephones.
The inside wiring is connected to the junction box.
The security module is installed correctly.
Access covers for the RAU and junction box are secured.
Cables are secured to the pole for protection from the wind.
Note
It is safe to connect the telephone prior to or subsequent to
applying power.
Connect power and test
32

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gsp-2900

Table of Contents