Mounting Of Replacement; Test And Use Of Pvg And Actuator; Returning Replaced Actuator For Customer Claims - Danfoss PVE 7 Series Service Manual

Electrohydraulic actuators
Hide thumbs Also See for PVE 7 Series:
Table of Contents

Advertisement

Service Manual
PVE Series 7
Exchanging PVE

Mounting of Replacement

Test and use of PVG and Actuator

Returning Replaced Actuator for Customer Claims

©
Danfoss | August 2017
1. Avoid contamination - also oil in connectors.
2. Avoid harming LVDT pin.
3. Depending on PVB – actuator orientation place one or all bolts in actuator bolt holes.
4. Reassure that O-rings are in place on actuator.
5. Place actuator on PVB and screw bolts lose and clockwise.
6. Tighten bolts to torque indicated in instruction.
7. Connect wiring.
After replacement of actuator the system must be tested after manufactures guidelines.
After service the PVG must be tested according to manufactures guidelines. Ensure that safety functions
and performance apply to demands.
Before restart bleed system. PVG can be bleed through PVM. Let application run for In worst cases air
must be washed out by oil in up to 5 minutes activation.
If replaced actuator is returned to Danfoss for analysis description of malfunction and application must
be submitted too. See form in section "returning claims".
AX00000348en-US | 0101 | 15

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PVE 7 Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents