Commissioning (max. only or max. & min.)
• Inlet valve
→ Open slowly
• Slam-shut bypass
→ Open slowly (stage 2)
• Regulator
→ Put into operation (see corresponding manual)
• 1
release relay stage
st
→ Set (Stage 1)
• Slam shut valve plug
→ Open (Stage 3)
• Outlet valve
→ Open slowly
The equipment is commissioned
After checking and commissioning the release relay it is
recommended to seal it

MAINTENANCE

Servicing Check
Recommended frequency:
• Twice yearly minimum
Verifi cation:
• Tripping and tripping value
• Slam-shut tightness
Departure positions
• Inlet valve
• Outlet valve
• Slam-shut
• Regulator
Inlet and outlet sides of regulator under pressure
Tripping verifi cation
• Inlet valve
• Outlet valve
• Regulator
Increase setpoint to reach tripping
(without exceeding the outlet limits)
Disassembly
Recommended frequency:
• Every 4 to 6 years (or less depending on operating
conditions)
• In the case of BMS 162 or 071, it is highly recommended to
check the condition of the diaphragm once yearly
Verifi cation:
• Condition of O-rings, diaphragm, and lubrication
6
Open
Open
Open
In operation
Closed
Closed
Replacement:
• O-rings, diaphragm
Tools:
• Spanners
10, 13, six-sided wrench 6
• Spanners
According to DN size
• Francel spanner ref. 197125 (bypass and pin disassembly)
• Valve plug closed
• Close inlet and outlet valves
• Bleed off outlet pressure
• Bleed off inlet pressure
• Unscrew impulse connection IS
• Remove BM cover (key 8)
• Unscrew fastening screw (key 9)
• Remove cap
• Remove BM
• Unscrew screws (key 10)
• Remove bonnet (key 11)
• Remove spring (rep. 12) and slam-shut valve plug
(key 13)
• Unscrew bypass (key 1)
• Unscrew screws (key 14) (DN 100 and 150)
The removal of the orifi ce (not recommended) requires a
special extraction tool
Type OSE - Commissioning Schematic
Figure 7.
Reassembly
• Perform the above operations in reverse order (respect
tightening torques)
• Replace O-rings at each disassembly
• The valve plug should be maintained in an upright position
using the packing gland to facilitate it's removal