ABB Relion 620 Series Installation Manuals page 38

Hide thumbs Also See for Relion 620 Series:
Table of Contents

Advertisement

Section 4
Mounting
30
1.
Mount the mounting panel into the 19" rack.
2.
Loosen the four M5 fixing screws in the case to fit the case into the panel cut-out.
3.
Mount the case to the panel cut-out.
4.
Install the optional metallic frame to mount the RTXP 24 test switch to the panel.
GUID-6B4F98A8-00E4-470F-A7EB-4E518D034E8B V1 EN
Figure 20:
Mounting kit for the IED and an RTXP 24 test switch
GUID-38A0F9DB-4E4C-4628-BB2B-046AA2B5ED91 V1 EN
Figure 21:
IED and the test switch RTXP 24 mounted into a 19" equipment panel
1MRS757641 E
620 series
Installation Manual

Advertisement

Table of Contents
loading

Table of Contents