Section 4
Mounting
22
1.
Mount the raising frame into the panel cut-out with four M5 screws.
B
D
C
GUID-0501C098-6BF8-4A0C-B448-B2CA8848C3FC V1 EN
Figure 11:
Mounting the raising frame
A 263 ±0.5 mm
1 Panel
B ∅ 6 mm
2 Raising frame
C 133 ±0.5 mm
3 M5 screw
D 162 ±1 mm
E 248 ±1 mm
2.
Loosen the four M5 fixing screws in the case to fit the case to the raising frame.
3.
Remove the protective film temporarily from the top side of the case.
4.
Mount the case to the raising frame.
GUID-E90CEAA6-B2AE-454F-8162-F5D0F2BB2899 V1 EN
Figure 12:
Mounting the case
5.
Tighten the M5 screws.