ABB Relion 620 Series Installation Manuals page 28

Hide thumbs Also See for Relion 620 Series:
Table of Contents

Advertisement

Section 4
Mounting
20
GUID-D5C8B9E4-24C0-42A5-8632-997132CEE995 V1 EN
Figure 9:
Flush mounted case, tightening the M5 fixing screws
4.
Install the plug-in unit into the case.
There is a protective film on the top side of the IED. Its purpose is to prevent debris
falling inside the unit while installing electrical wiring. Remove the protective film
before energizing the IED.
1MRS757641 E
620 series
Installation Manual

Advertisement

Table of Contents
loading

Table of Contents