Installation and Operation

5.1

Unpacking

Carefully unpack the diaphragm pump.
Check the pump for:
• Transport damage,
• Conformity with the specifications of the supply contract (type, electrical supply data),
• Completeness of the delivery.
Please inform Ilmvac GmbH without delay if there are discrepancies between the delivery
and the contractually agreed scope of delivery, or if damage is detected.
Please take note of the general terms of business of ILMVAC GmbH.
The pump must be returned in the original packaging in order to make a claim under
warranty.
5.2

Installation and Connection

1. Set the diaphragm pump on a flat and horizontal surface.
2. Remove the protective caps on the suction and pressure ports.
3. Prepare the connections.
4. Connect the NW 8 vacuum connector to the suction port.
5. Connect the exhaust pipe to the pressure connection.
6. Connect the diaphragm pump to the electrical supply.
5.3

Operation

Observe the basic safety instructions when using the pump.
The diaphragm pump is switched on and off at the operating switch.
The operating company must install a main switch for pumps with terminal boxes.
5.4

Storage

The pumps are to be stored in a low-dust, interior room within the temperature range from
+ 5 to + 40 °C and at a relative air humidity < 90%.
Leave the protective elements on the suction and pressure ports. Another equally good pro-
tection may be used.