Page 2
(1) Back Rail Top (1) Left End Frame (1) Right End Frame (1) Back Rail Middle (4) Lower Rails (1) Front Rail Top (1) Top Shelf (2) Lower Shelves (14) 1-1/2" Allen head Bolts (1) Foam Pad (1) Allen Wrench...
Page 3
A S S E M B L Y I N S T R U C T I O N S ! WARNING READ ALL INSTRUCTIONS BEFORE USE OF THE CHANGING TABLE OR THE CHANGING PAD. KEEP ALL INSTRUCTIONS FOR FUTURE USE. WARNING: FALL HAZARD - TO PREVENT DEATH OR SERIOUS INJURY, ALWAYS KEEP CHILD WITHIN ARM’S REACH.
Page 4
Changing Table Assembly Step 1 Attach the (1) Back Rail Middle (Part D) & (1) Front Rail Top (Part F) BE SURE THE GROOVES ARE TOWARDS THE BOTTOM OF THE UNIT AND FACING INWARD. & (4) Lower Rails (Part E) to the Left End Frame (Part A) using (6) 1-1/2″...
Page 5
Step 3 Attach the Right End Frame (Part B) to the Rails using (6) 1-1/2″ Allen head Bolts (Part J). See Figure 3. Figure 3 Step 4 Insert the tenon of the Back Rail Top (Part C) into the slot on the top of the Back Rail Middle (Part D), Then insert the 1-1/2″...
Page 6
Step 5 1.Check that the bolt securing the strap is tight using the Allen Wrench (Part K). 2.Insert the strap through the hole in the Foam Pad (Part L). 3.Place Foam Pad (Part L) on Top shelf (Part G). See Figure 5 & 5A. Figure 5 Changing Table Figure 5A...
Page 7
TO FASTEN STRAP - PUTH BUCKLE SIDE TOGETH- TO RELEASE PRESS BOTH TABS AND PULL APART ERBESURE BUCKLE IS FULLY FASTENED TO SECURE CHILD SAFFELY Warranty: Your Delta Baby Gear is warranted to be free from defects for a period of 90 days from the date of purchase under normal use.