Installation Check List - EFOY ProCube 2060A User Manual

Table of Contents

Advertisement

Available languages

Available languages

3. Operation

3.8 Installation Check List

Required action
1) Open / Unlock EFOY ProCube
Battery connection
2) Insert batterie(s)
3) Mount batterie(s) with mounting belts, if necessary use the battery spacers
4) Connect battery terminals to installed battery clamps
5) Only 24 V: Connect batteries in series with 24 V battery connection cable
6) Switch on the main switch of the EFOY ProCube
The solar charge controller is now connected to the battery. If the connection
polarity is correct, the info LED of the solar charge controller illuminates green
EFOY Pro fuel cell connection
7) Insert and mount the EFOY Pro fuel cell onto the mounting plate
8) Connect the exhaust hose
9) Connect the operating panel OP2 via data line to the EFOY Pro
10) Insert the EFOY fuel cartridge(s) into the foreseen space
11) Connect the EFOY fuel cartridge with M28-adapter to the fuel cartridge
connector(s)
12) Connect the EFOY Pro fuel cell to the battery via the pre-installed charge line
connector
The EFOY Pro fuel cell is now connected to the battery. The info LED illuminates
green. Check the operating panel for initial configuration
13) Switch the EFOY Pro fuel cell manually on via the operating panel OP2 for a test
run (Only possible if the battery voltage is lower than 13,2 V or 26,4 V)
14) Connect the solar module to the solar charge controller. Ensure that the solar
module is protected from solar radiation for the duration of the installation.
15) Connect the load (deactivated) to the solar charge controller and switch it on
The EFOY ProCube is now ready for use, the load should be active
16) Check the solar charge controller, the EFOY Pro and the load for correct operation
17) Close and lock the EFOY ProCube
18) Make sure that the air in- and outlet is not blocked and the maximum inclination
angles are not exceeded.
17

Advertisement

Chapters

Table of Contents
loading

Table of Contents