Installation Check List - EFOY ProEnergyBox 4060P User Manual

Table of Contents

Advertisement

Available languages

Available languages

3. Operation
3.9

Installation check list

Required action
1) Open / Unlock EFOY ProEnergyBox
Battery connection
2) Insert batterie(s)
3) Mount batterie(s) with mounting belts at cramps
4) Connect battery terminals to installed battery clamps
5) Only 24 V: Connect batteries in series with 24 V battery connection cable
The solar charge controller is now connected to the battery. If the connection
polarity is correct, the info LED illuminates green.
EFOY Pro fuel cell connection
6) Insert the EFOY fuel cartridge(s) into the foreseen space
7) Insert and mount the EFOY Pro fuel cell onto the mounting plate
8) Connect the exhaust hose
9) Connect the operating panel OP2 via data line to the EFOY Pro
10) Connect the EFOY fuel cartridge to the fuel cartridge connector(s)
11) Connect the EFOY Pro fuel cell to the battery via the pre-installed charge line
connector
The EFOY Pro fuel cell is now connected to the battery. The info LED illuminates
green. Check the operating panel for initial configuration.
12) Switch the EFOY Pro fuel cell manually on via the operating panel OP2.
13) Connect the solar module. Ensure that the solar module is protected from incident
light.
14) Connect the load (deactivated) and switch it on
The EFOY ProEnergyBox is now ready for use, the load should be active.
15) Check the solar charge controller, the EFOY Pro fuel cell and the load for correct
operation.
16) Close and lock the EFOY ProEnergyBox
17) Make sure that the air in- and outlet and the exhaust hose is not blocked and the
inclination comply with the specifications.
16

Advertisement

Chapters

Table of Contents
loading

Table of Contents