Disassembly; Installation Of Shipping Stop - Siemens Milltronics MILLFLO Instruction Manual

Table of Contents

Advertisement

Disassembly

Remove the load cell/sensing plate assembly from the housing prior to installation.
1.
Remove the access cover, loosen
the shipping rod nuts as shown,
and then remove. Retain
calibration weight cable for use in
the calibration procedure.
2.
Secure access door.
3.
Remove and hold top cover/
junction box assembly. Avoid
applying stress to the load cell
cable connected through the
cover to the junction box.
4.
Hold the load cell by the upper
cross piece. (See
Handling on
5.
Remove load cell mounting
screws (2 places), and then lift
load cell/sensing plate assembly
up and out of the housing,
keeping the sensing assembly
vertical.
6.
Set the assemblies aside in a safe
place.
IMPORTANT: While transporting, support the load cell / sensing plate
assembly as shown in Load Cell Handling on page 6.

Installation of Shipping Stop

Whenever the unit is to be moved, the
shipping stop should be reinstalled to
prevent damage to the load cell/sensing
plate assembly.
1.
With the sensing plate resting in
its static position, insert
threaded rod as shown.
2.
Tighten the two end nuts against
the housing to secure the rod in
place.
3.
Turn the two opposing sensing
plate locking nuts toward the
sensing plate, maintaining the
sensing plate in its static
position. Tighten nuts to secure
sensing plate.
7ML19985CS01
Load Cell
.
page 6)
Milltronics Millflo – INSTRUCTION MANUAL
top cover screws
(4 places)
gasket
load cell
cable
load cell
mounting
screws
(2places)
top cover /
junction box
assembly
top cover
flange
calibration weight
cable
load cell / sensing
plate assembly
access cover
shipping stop
(threaded rod)
loosen 2nd to
remove
shipping stop
loosen first to free
sensing plate
Page 7

Advertisement

Table of Contents
loading

Table of Contents