Download Print this page

National Alloy Assembly Instruction

Ganging kit

Advertisement

Quick Links

Note: Attach all ganging kits desired before installing either powered or
non-powered beam.
Remove crosslink tube ganging hole cover from both adjustable height
1
units to be ganged together as shown in Figure A.
Figure A:
Align the first ganging tube with the two holes in the crosslink tube. Us-
2
ing the supplied M8 x 45 screws secure one side of the ganging tube to
the adjustable height unit's crosslink tube as shown in Figure B. Repeat
for the second ganging tube.
Figure B:
Align the opposite side of the ganging tubes to the second adjustable
3
height unit's crosslink tube holes. Secure both ganging tubes using
the supplied screws as shown in Step 2.
Proper product installation, in accordance with these instructions, is the responsibility of the installing agent.
If you have any questions concerning these instructions, please call National Customer Service
Ganging Hole Cover
Ganging Tube
Crosslink Tube
Assembly Instruction
Alloy
Ganging Kit
Package Contents
Hardware
M8 x 45 Screw
Component
Ganging Tube
Ganging Tube Cover
Tools Required
5mm Allen Wrench
Telephone 800.482.1717
Fax 812.482.8800
www.NationalOfficeFurniture.com
Part # 2892080
Rev, -
Printed in U.S.A
© 2014 Kimball International, Inc.
.
800.482.1717
Qty
4
Qty
2
1

Advertisement

loading

Summary of Contents for National Alloy

  • Page 1 Part # 2892080 Rev, - Printed in U.S.A © 2014 Kimball International, Inc. Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call National Customer Service 800.482.1717...
  • Page 2 Part # 2892080 Rev, - Printed in U.S.A © 2014 Kimball International, Inc. Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call National Customer Service 800.482.1717...