Step 3
Step 1: Remove the guide rail fastener;
Step 2: Remove the DIN clamp in the rear panel;
Step 3: Find the wall mounting accessory, and loosen these 4 screws in the Switch.
Step 4: Mounting the accessory on the rear panel;
Step 5: Fixed the switch on the wall.

4.3 Items for attention

Operating Ambient: If the product is installed in a closed rack, the inside operating
ambient temperature of the rack may be higher than outside. Therefore,
consideration should be given to installing the equipment in an environment
compatible with the maximum operating temperature specified by the manufacturer.
Air Flow: Installation of the equipment in a rack should be such that the amount of
air flow required for safe operation of the equipment is not compromised.
Circuit Overloading: Consideration should be given to the connection of the
equipment to the supply circuit and the effect that overloading of the circuits might
have on overcurrent protection and supply wiring.
Reliable Earthing: Reliable earthing of rack-mounted equipment should be
maintained. Particular attention should be given to supply connections other than
direct connections to the branch circuit (e.g. use of power strips).

4.4 Grounding

Grounding and wire routing help limit the effects of noise due to electromagnetic
ESULS8-P2-B Quick Start Guide-Rev1709.docx
Copyright © KBC Networks Ltd. 2017
ESULS8-P2-B Quick Start Guide
Page 9 of 13
Step 4
www.kbcnetworks.com

Advertisement

Table of Contents
loading

Table of Contents