Summary of Contents for Global Contract Bridges II
Page 1
2017 Installation Manual Global Contract, 565 Petrolia Road ISO 9001:2015 ISO 14001:2015 OHSAS 18001:2007 North York, Ontario, M3J 2X8 REVISED: FALL 2017 Visit us on the Internet at globalcontract.com • (416) 739-5000...
Storage Spine Storage and Boulevard Systems Storage Cabinet Leg Assembly Please contact your Global Contract Service Representative at 416-739-5000 for any questions or concerns. NOTE: Any alterations to listed components will void the manufacturer’s warranty. turer’s specifi cations. In accordance with the manufacturer’s policy of continual...
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Bridges 2 Installation Sequence NOTE: Although some illustrations depict round legs and some rectangular legs, the STEP 3: WORKSURFACES leg-to-beam and leg-to-work surface assembly is the same. STEP 4: ACCESSORIES - task and paper organizers STEP 1: LAYOUT ORIENTATION Determine type and location of accessories as specifi...
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Supporting Structure Round Leg Height Adjustment Set the legs to desired height. * STEP 3: If the desired top surface height is 29” from the fl oor, for instance, and the table structure is to be on levelers, align top threaded hole in the inner leg (1) with the The inner leg has two threaded holes.
Page 5
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Supporting Legs And Beams Cont. STEP 3: Position beam’s end bracket over leg’s horizontal, rectangular tube. STEP 4: Secure top and bottom bracket ends with two supplied screws. But do not tighten the bottom screw. Level the whole assembly.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Telescopic Beam Designed to provide support for worksurfaces perpendicularly connected to a primary table run. The telescopic beam is connected to the leg’s horizontal, rectangular tube on one side, while the opposite side is secured off module to the perpendicular, central beam and can be adjusted to accommodate 24”...
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES 120° Leg STEP 1: Align two mounting holes in beam with two holes in the integrated 120º beam bracket and secure both beams with included screws. STEP 2: Install the Adjustable beam clamp for End of run application (A) or Shared leg application (B).
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Storage Table Beam Storage table beam’s fl exibility allows for a single table application (with the table leg tucked in under the work surface) as well as for a double table installation (two adjacent tables supported by a shared leg in the middle (A) and two storage cabinets at the opposite ends).
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Sliding Table Kit NOTE: Round legs: 3” Sliding Return can be installed anywhere along the front edge of work sur- face supported by round legs. Rectangular legs: Sliding Return can be installed along the front edge of work surface between Rectangular legs.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Round Table Supports Round table rectangular leg structure consists of four 120° legs. STEP 1: Put round top upside down on a clean fl at surface. STEP 2: Position each individual leg. STEP 3: Secure the legs with the supplied screws. Level the whole assembly. Glide Tray Adapter Both machine screws and wood screws are provided with each pair of brackets.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Power, Data and Cable Management Overview Wire basket Above worksurface Back 2 Back Power trough with base feed and ceiling feed Below work surface Back 2 Back Power trough with base feed Ceiling feed Below work surface Single sided Power trough with base feed Storage Power box Rectangular Leg has vertical wire manager built into leg.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Below Worksurface Power Trough Installation STEP 1: Install four brackets (two pairs of left and right brackets are required). Below work surface Power troughs are provided with 4 pairs of mounting holes to accom- modate the brackets at various table leg positions.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Base Feed Identify type and location of required electric components and position them in accordance with layout plans. NOTE: four oblong holes in the Power feed mounting bracket must always align with four oblong holes in the Power Trough, regardless the Power Trough mounting bracket position.
Page 15
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES STEP 7: Secure interconnected Electrical Components to Power Troughs: Pro- ceed from the Power Feed by connecting its harness to the Power Distribution STEP 11: Reach around power trough and push down on tab to lock. You will Housing.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Organize data/communication cables on the ground just below their future location. STEP 12: Thread cable through data/communication opening (located in the middle of each Power Trough). Connect terminals and snap terminal plate into data/communication opening.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Single Sided Power Trough STEP 1: Identify correct length of Single- sided Power Trough and position it up against the bottom of work surface so that its shorter lip rests against the table supporting beam.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Above Worksurface Power Trough Identify correct length of Above Work Surface Power Troughs and place them on work surface in their respective locations. Identify type and location of required electric components and position them in accordance with lay-out plans.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Back 2 Back Storage Tower Gap Filler Kit Cover trough’s installation consists of securing four brackets to work surfaces immediately adjacent to storage towers. Brackets can be installed in two posi- tions, which determine whether the trough cover is going to function as an Above work surface or Below work surface trough cover.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES 34” Leg Shroud STEP 1: Complete installation of tables, worksurfaces, power troughs, power outlets and data/communication cables. STEP 2: Remove Vertical cable manager from both legs. Engage tabs at either bottom end of the shroud with the groove in the legs (the same groove Vertical Cable Managers snap into).
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Ceiling Feed Ceiling feed pole kit consists of a two-part vertical channel and two bottom brackets. Ceiling feed pole installation on Above and Below Power troughs is identical. Above trough is illustrated. Ceiling feed harness has already been connected to the Power Distribution Module and data / communication cables, hanging from the ceiling, enter designated Power trough through its grommet.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Power Distribution Storage Power Box In order to secure Storage power box to Storage cabinets it is necessary to reposition one of the storage supporting legs so that it will support the Storage power box as well. Every storage leg is provided with two hole patterns: 3+3 holes positioned closer to the edges of the leg extrusion and 2+2 hole pattern closer to the centre of the extrusion.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Parallel Dividers, Back 2 Back Tables, Glass And Laminate 36”, 42”, 48”, 54, 60” and 72” wide dividers have two Back 2 Back divider brackets. 78” and 84” dividers have three. STEP 1: Back 2 Back divider brackets can be set set up to support glass dividers and laminate dividers as well.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Side 2 Side Laminate Divider Note: Side 2 Side laminate divider can be installed in the middle of a work surface and over two adjacent work surfaces supported by round legs. Because rectangular legs occupy bottom corners of work surfaces it cannot be installed over two adjacent work surfaces unless they are supported by 34”...
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Table Mounted Divider With Integrated Modesty Panel, Laminate Note: Perpendicular Double Divider can only be installed in conjunction with Laminate Parallel Dividers (BRTLPDD) STEP 1: Line up Perpendicular Divider Brackets (one with nut & one without) with hole in the divider.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Perpendicular End of Run Dividers Note: the Perpendicular end of a run divider can only be installed on rectangular legs. Remove vertical cable manager cover from both legs. STEP 1: Align top brackets with pilot holes and secure with supplied screws. STEP 2: Slide the End Of Run Divider top brackets between top of leg’s horizontal beam and the bottom of the work surface and secure with supplied screws.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Half Height Rectangular Leg Gable Note: Rectangular leg gables can only be installed on rectangular legs. Proceed by STEP 4: Wiggle the gable slightly up while making sure that both bottom brackets are removing vertical cable manager from both legs fi...
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Full Height Rectangular Leg Gable Note: Rectangular leg gables can only be installed on rectangular legs. Proceed by STEP 4: Wiggle the gable slightly up while making sure that both bottom brackets are removing vertical cable manager from both legs fi...
Page 29
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Table Mounted Divider with Integrated Modesty Panel, Glass Secure Bracket to the glass STEP 1: Slide Rubber washer onto threaded studs. STEP 2: Slide Spacers onto the threaded studs with fl ange fi rst. STEP 3: Position Bracket onto the glass and secure with two anodized caps.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Glass Perpendicular, End of Run Divider STEP 1: Slide Rubber washer onto threaded studs. STEP 2: Slide Spacers onto the threaded studs with fl ange fi rst. STEP 3: Position Bracket onto the glass and secure with two anodized caps. STEP 4: Insert a pin into the hole in the cap and tighten.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Perpendicular, Side to Side Glass Divider NOTE: Cannot be installed over two, side-by-side rectangular legs. Only One shared or recessed leg. STEP 1: Press rear edge of the divider into the bracket. STEP 2: Slide the divider with the bracket over the rear edge of the worksur- face.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Storage Mounted B3 Divider - Panel Frame Installation STEP 1: Insert support bracket against the inner vertical wall as indicated above. STEP 2: Secure support bracket through the inside of panel with provided ma- chine screws.
Page 33
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Storage Mounted B3 Divider - Accessory Tile & Fabric Tile Combo Installation STEP 1: Step 1: Install accessory rail locking bracket, machine screws go in to the provided inserts. Leave screws loose so that the bracket can slide up and down. STEP 2: Install accessory rail &...
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Storage Mounted Service Panels - End Trim Bracket Installation STEP 1: Slide bracket under cabinet and locate it on the existing screws. STEP 2: Tighten screws to secure bracket in place. STEP 3: Line up trims and install plastic extrusion starting from the bottom up.
Page 35
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Base Feed Installation STEP 1: Insert base feed conduit and bracket through slot in the panel frame. STEP 2: Rotate bracket into position. STEP 3: Loosen screw enough so that bracket can slide above it. STEP 4: Once bracket is pushed tight against screw, tighten the screw until snug.
Page 36
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Table Mounted Panels STEP 1: Back 2 Back work surfaces are provided with pilot holes for accurate location of Back 2 Back divider brackets. Align the brackets with pilot holes and secure with supplied screws. STEP 2: Place panel frame on top of Back to back divider brackets, and center with work surface.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Accessory Rail Installation Single Sided Table mounted accessory rail kits vary in length and in types of supporting verti- cal uprights: - single sided accessory rails for single tables, and - double-sided accessory rail for shared, back-2-back applications. Identify the required rail length and support type.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Accessory Rail Installation Single Sided Table mounted accessory rail kits vary in length and in types of supporting verti- cal uprights: Identify the required rail length and specifi ed support type. DOUBLE SIDED RAIL FOR BACK-2-BACK TABLE APPLICATIONS: STEP 1: Slide both upright brackets into corresponding grooves in the back of both rail assemblies.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Bridges Hanging Metal Shelf Installation STEP 1: Determine which side of the table the shelf should be on and make sure the front of the shelf is fl ush with the table leg. STEP 2: Make sure front edge is parallel to work surface, hold in place and fasten supplied screws through the bottom of the shelf into the bottom of the work surface.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Table Mounted Centre Shelf Note: Centre Mount Shelf MUST be installed before Under Work Surface Power Trough. STEP 1: Line up Bridges Storage leg holes with pilot holes on the worksurface. STEP 2: Align Back 2 Back divider brackets with the edge of the Bridges storage leg.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Elevated Shelves: Parallel / Perpendicular Parallel elevated shelf A fi ts over gap between two Back 2 Back tables. Grommets in its gables accommodate cable passage and Above work surface power trough. Establish fi nal location of Perpendicular elevated shelf B in accordance with your plans. Position it in place and peel off protective layer from adhesive tape at the bottom of the perpendicular elevated shelf gables.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Table Mounted End Shelf Note: the Table end shelf can only be installed on rectangular legs. Remove vertical cable manager cover from both legs. Installation of this product requires that this product is placed on assemble leg frame prior to installing worksurfaces.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Table Mounted End Shelf - Continued STEP 5: Place work surfaces on the legs/beams support structure and adjust the work surfaces so that they line up with the external edges of the Table End Shelf’s top.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Storage Spine Storage units of equal depth can be confi gured to form longer, interconnected units supported by shared legs. The following steps describe how to convert single storage leg into a shared one: Every storage leg is provided with two hole patterns: 3+3 holes positioned closer to the edges of the leg extrusion and 2+2 hole pattern closer to the centre of the extrusion.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Storage and Boulevard Systems Integration Several storage units have been designed to connect to Boulevard panel vertical slots. STEP 3: Secure the bottom bracket, but Do NOT tighten. The bottom brackets These specialized units are supported by a leg at the front and by a set of included must be free to slide up in the slots.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Storage Cabinet Leg Assembly STEP 1: Identify Screws: (A) 6pcs - 1/4 -20 x1” Pan Head Screws (B) 6pcs - 5/16 - 18 x 1.75 Hex socket Head Screws. STEP 2: Secure Leg to the storage cabinet with the screws. NOTE: Drive Hex socket screws into gables.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Seat Partitions Seat partition kit consists of two side gables and one rear partition. STEP 1: Insert provided pins into gable fi ttings on both side partitions as il- lustrated. STEP 2: Align gables with the back panel; align pins with fi ttings in the back panel.
Page 48
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Seat Privacy Partitions: Securing the seat to the partitions STEP 3: Drive seat and partition levelers all the way in and bring the seat into position, all the way against the back partition. STEP 4: Use Allen key to loosen 4 screws (A) at the farthermost points of sup- port legs.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Square Corner and Inline Block, no Outlet 25” high square corner block can function as a self-supporting, freestanding unit or it can be secured to adjacent bridges seats. 6” block must be supported by a seat on either side.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Ganging Brackets Ganging bracket kit serves to connect seat to seat or seat to bridges storage in line. Place units into their fi nal position. STEP 1: Use Phillips or Robertson screw bit to loosen 4 machine screws (B) on the inner side of support legs.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Connecting Seat to Bridges Tables Some bridges collaborative seating units have been designed to connect to bridges tables supported by rectangular legs. These specialized units are selfsupporting, but connect to other components to form a rigid, integrated assembly.
Page 52
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Connecting Seat to Bridges Tables Continued STEP 6: Install six fl at brackets as illustrated. STEP 7: Rest the 30” deep work surface on the fl at backrest. STEP 8: Rest the 6” deep work surface with the Rear vertical board on the fl at brackets.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Below Work Surface Power Trough and Bridges Seat/Table Application Standard Below work surface Power trough brackets rely on shared table leg beams for support. As Seat/table bridges application doesn’t share table legs the Below work surface Power trough utilizes 4 “Z” brackets. STEP 1: Secure 4 “Z”...
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Connecting Display Wall to Bridges Tables Display wall is typically supported by a Back 2 Back bridges table. See previous pages for detailed table installation instructions. STEP 1: Use short 1/4-20 machine screws to secure four brackets to threaded inserts.
GLOBAL Contract • Summer 2017 INSTALLATION GUIDELINES Display Wall Cable Manager - TV / Display Facing the Work Surfaces: There are two versions of TV / Display cable managers: One is intended for TV / Display facing the work surfaces and the other mounts under the TV / Display facing outside of the table assembly.
Page 56
GLOBAL Contract • July 2012 GLOBAL Contract • June 2016 THE GLOBAL GROUP SHOWROOM 1350 Flint Road, Toronto, Ontario, M3J 2J7 Sales & Marketing • TEL: 1-877-446-2251 • FAX: 416-667-0338 Customer Service • TEL: 416-739-5000 • FAX: 800-361-3182 VANCOUVER SHOWROOM 3823 Still Creek Avenue Burnaby, BC, V5C 4E2 •...
Need help?
Do you have a question about the Bridges II and is the answer not in the manual?
Questions and answers