Advertisement

Quick Links

Licence 2
Installation
Manual
OHSAS 18001:2007
REVISED: FALL 2017
Visit us on the Internet at globalcontract.com • (416) 739-5000
ISO 9001:2015
ISO 14001:2015
2017
Global Contract Inc. 565 Petrolia Road
North York, Ontario, M3J 2X8

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Licence 2 and is the answer not in the manual?

Questions and answers

Summary of Contents for Global Contract Licence 2

  • Page 1 2017 Licence 2 Installation Manual Global Contract Inc. 565 Petrolia Road OHSAS 18001:2007 ISO 9001:2015 ISO 14001:2015 North York, Ontario, M3J 2X8 REVISED: FALL 2017 Visit us on the Internet at globalcontract.com • (416) 739-5000...
  • Page 2 Tables P.82 FreeFit Please contact your Global Contract Service Representative at 416-739-5000 for any questions or concerns. NOTE: Any alterations to listed components will void the manufacturer’s warranty. turer’s specifi cations. In accordance with the manufacturer’s policy of continual...
  • Page 3: Assembly Hardware

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Assembly Hardware - Modular Connectors Modular Connector (clip) and Shoulder Screw Modular Connector (clip) • This connector offers a hidden connection between two panels. • The modular connector and a connector screw are used in combination to assemble panels.
  • Page 4 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Assembly Hardware - Hinges Hinge & Mounting Plate with Euro Screws Assembly • The hinge is a tool-free attachment of hinge to door. • Individual components and fi ttings do not need to be assembled until they reach their fi...
  • Page 5 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Pre-Drilling Location Sheet L2 Template for predrilling the hole location on the pedestals for use with modesty panels. L2ER - BL/BR L2DR - BL/BR L2DR - FB/BF 6” REC MOD FLUSH MOD 92.2mm HALF HEIGHT 96mm MODESTY...
  • Page 6 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Page • globalcontract.com...
  • Page 7: L2Drxxxxfb

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2DRxxxxFB Required Tools Safety Glasses Screwdriver #2 Phillips Screwdriver Roberson Rubber Mallet Level Included Hardware Blum Connector Blum Connector Modular Connector Modular Screw Wood Screw #8 3/4 NOTE: Open and assemble only one product Screw L005650060 (installed) L005650061 (installed) L004250001...
  • Page 8 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Page • globalcontract.com...
  • Page 9: L2Dr-Fb

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2DR-FB Double Pedestal Desk Required Tools Safety Glasses Screwdriver #2 Phillips Screwdriver Roberson Rubber Mallet Level Included Hardware Blum Connector Blum Connector Modular Connector Modular Screw NOTE: Open and assemble only one product Screw L005650060 (installed) L005650061 (installed) L004250001...
  • Page 10 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Page • globalcontract.com...
  • Page 11: L2Dr-Bl

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2DR-BL Single Pedestal Desk Required Tools Safety Glasses Screwdriver #2 Phillips Rubber Mallet Level Included Hardware Blum Connector Blum Connector Modular Connector Modular Screw Leveler Screw L005650060 (installed) L005650061 (installed) L004250001 L007250001 L007250037 NOTE: Open and assemble only one product at a time to avoid a potential mix-up of parts and hardware.
  • Page 12 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES FULL MODESTY WORKSURFACE BBF PED GABLE LEFT HAND RIGHT HAND Connection for pedestal Connection for gable Page • globalcontract.com...
  • Page 13: L2Drhxxxxbr

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2DRHxxxxBR • Single Pedestal Desk Resessed Half Modesty Required Tools Safety Glasses Screwdriver #2 Phillips Screwdriver Roberson Rubber Mallet Included Hardware Blum Connector Blum Connector Modular Connector Modular Screw Leveler Screw L005650060 (installed) L005650061 (installed) L004250001 L007250001 L007250037...
  • Page 14 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES HALF MODESTY BBF PED GABLE LEFT HAND RIGHT HAND Connection for pedestal Connection for gable Page • globalcontract.com...
  • Page 15: L2Erxxxxfl

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2ERxxxxFL Required Tools Safety Glasses Screwdriver #2 Phillips Screwdriver Roberson Rubber Mallet Level Included Hardware Blum Connector Blum Connector Modular Connector Modular Screw Screw L005650060 (installed) L005650061 (installed) L004250001 L007250001 NOTE: Open and assemble only one product at a time to avoid a potential mix-up of parts and hardware.
  • Page 16 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES WORKSURFACE FF PED FULL MODESTY Page • globalcontract.com...
  • Page 17: L2Erh-Fl

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2ERH-FL Required Tools Safety Glasses Screwdriver #2 Phillips Screwdriver Roberson Rubber Mallet Level Included Hardware Blum Connector Blum Connector Modular Connector Modular Screw NOTE: Open and assemble only one product Screw L005650060 (installed) L005650061 (installed) L004250001 L007250001 at a time to avoid a potential mix-up of parts...
  • Page 18 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Page • globalcontract.com...
  • Page 19: L2Grxx

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2GRxx Required Tools Safety Glasses Screwdriver #2 Phillips Screwdriver Roberson Rubber Mallet Level Included Hardware Blum Connector Blum Connector Modular Connector Modular Screw Screw L005650060 (installed) L005650061 (installed) L004250001 L007250001 NOTE: Open and assemble only one product at a time to avoid a potential mix-up of parts and hardware.
  • Page 20 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Page • globalcontract.com...
  • Page 21: L2Gb

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2GB Required Tools Safety Glasses Screwdriver #2 Phillips Screwdriver Roberson Rubber Mallet Level #4 & 5 Hex Wrench NOTE: Open and assemble only one product at a time to avoid a potential mix-up of parts and hardware.
  • Page 22 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Page • globalcontract.com...
  • Page 23: L2Gbxxl

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2GBxxL Required Tools Safety Glasses Screwdriver #2 Phillips Screwdriver Roberson Rubber Mallet Level #4 & 5 Hex Wrench NOTE: Open and assemble only one product at a time to avoid a potential mix-up of parts and hardware.
  • Page 24 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Page • globalcontract.com...
  • Page 25: L2Gd

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2GD Required Tools Safety Glasses Screwdriver #2 Phillips Screwdriver Roberson Rubber Mallet #4 & 5 Hex Wrench Included Hardware Socket Screw Spacer Connecting Dowel Connecting Cam Leveler L005650180 L005650117 L004250004 L002250002 L007250037 NOTE: Open and assemble only one product at a time to avoid a potential mix-up of parts and hardware.
  • Page 26 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES BOLT SPACER Page • globalcontract.com...
  • Page 27: L2Gdp

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2GDP Required Tools Safety Glasses Screwdriver #2 Phillips Screwdriver Roberson Rubber Mallet #4 & 5 Hex Wrench Included Hardware Socket Screw Spacer Connecting Dowel Connecting Cam Leveler L005650180 L005650117 L004250004 L002250002 L007250037 NOTE: Open and assemble only one product at a time to avoid a potential mix-up of parts and hardware.
  • Page 28 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES BOLT SPACER Page • globalcontract.com...
  • Page 29: L2Crsxxxx

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2CRSxxxx Required Tools Safety Glasses Screwdriver #2 Phillips Rubber Mallet Level Included Hardware Blum Connector Blum Connector Leveler “T” Nut Insert Screw L005650060 (installed) L005650061 L007250037 L007250039 NOTE: Open and assemble only one product at a time to avoid a potential mix-up of parts and hardware.
  • Page 30 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Modesty Panel LEFT HAND RIGHT HAND Back Panel top Underside Page • globalcontract.com...
  • Page 31: L2Crshxxxx

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2CRSHxxxx • L2 Credenza Shell Half Modesty Required Tools Safety Glasses Screwdriver #2 Phillips Rubber Mallet Level Included Hardware Blum Connector Blum Connector Leveler “T” Nut Insert Screw L005650060 (installed) L005650061 L007250037 L007250039 NOTE: Open and assemble only one product at a time to avoid a potential mix-up of parts and hardware.
  • Page 32 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES LEFT HAND RIGHT HAND Back Panel Top Underside Page • globalcontract.com...
  • Page 33: L2Rcxxxxl

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2RCxxxxL Required Tools Safety Glasses Screwdriver #2 Phillips Screwdriver Roberson Rubber Mallet Level #4 & 5 Hex Wrench NOTE: Open and assemble only one product at a time to avoid a potential mix-up of parts and hardware.
  • Page 34 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES LEFT HAND RIGHT HAND LEFT HAND APPLICATION RIGHT HAND APPLICATION LEFT HAND RETURN CONNECTING RIGHT HAND RETURN CONNECTING Note: Follow the same directions for the right hand of the application. Page • globalcontract.com...
  • Page 35: L2Rchxxxxl

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2RCHxxxxL Required Tools Safety Glasses Screwdriver #2 Phillips Screwdriver Roberson Rubber Mallet Level #4 & 5 Hex Wrench NOTE: Open and assemble only one product at a time to avoid a potential mix-up of parts and hardware.
  • Page 36 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES LEFT HAND RIGHT HAND LEFT HAND APPLICATION RIGHT HAND APPLICATION RIGHT HAND RETURN CONNECTING Back Panel Top Underside Page • globalcontract.com...
  • Page 37: L2Rcxxxxc

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2RCxxxxC Required Tools Safety Glasses Screwdriver #2 Phillips Screwdriver Roberson Rubber Mallet Level Included Hardware Blum Connector Blum Connector Flat Bracket Flat Bracket Leveler Screw L005650060 (installed) L005650061 L005650025 L005651035 L007250037 NOTE: Open and assemble only one product at a time to avoid a potential mix-up of parts and hardware.
  • Page 38 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES LEFT HAND APPLICATION RIGHT HAND APPLICATION Back Panel Top Underside Page • globalcontract.com...
  • Page 39: L2Rchxxxxc

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2RCHxxxxC Required Tools Safety Glasses Screwdriver #2 Phillips Screwdriver Roberson Rubber Mallet Level #4 & 5 Hex Wrench NOTE: Open and assemble only one product at a time to avoid a potential mix-up of parts and hardware.
  • Page 40 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES LEFT HAND APPLICATION RIGHT HAND APPLICATION RETURN CONNECTING (b) HALF MODESTY PANEL Back Panel Top Underside Page • globalcontract.com...
  • Page 41 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2ER_R / L2ER_L • L2 Executive Return Left or Right Required Tools Safety Glasses Screwdriver #2 Phillips Screwdriver Roberson Rubber Mallet Level Included Hardware Blum Connector Blum Connector Modular Screw Leveler Wood Screw #8 3/4 Screw L005650060 (installed) L005650061 L007250001...
  • Page 42 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES LEFT HAND RIGHT HAND FULL MODESTY PANEL LEFT HAND APPLICATION RIGHT HAND APPLICATION Page • globalcontract.com...
  • Page 43: L2Erh-L

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2ERH-L Required Tools Safety Glasses Screwdriver #2 Phillips Screwdriver Roberson Rubber Mallet Level Included Hardware Blum Connector Blum Connector Wood Screw #8 3/4 Leveler “T” Nut Insert Screw L005650060 (installed) L005650061 L007250032 L007250037 L007250039 NOTE: Open and assemble only one product at a time to avoid a potential mix-up of parts...
  • Page 44 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES LEFT HAND RIGHT HAND Back Panel (c) LEFT HAND APPLICATION RIGHT HAND APPLICATION Page • globalcontract.com...
  • Page 45: L2Bxxxx

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2Bxxxx Required Tools Safety Glasses Screwdriver #2 Phillips Screwdriver #2 Roberson Rubber Mallet Included Hardware Blum Connector Blum Connector Flat Bracket Wood Screw #8 3/4 (installed) L005650061 Screw L005650060 L005650025 L007250032 NOTE: Open and assemble only one product at a time to avoid a potential mix-up of parts and hardware.
  • Page 46 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Page • globalcontract.com...
  • Page 47: L2Ecxxxxxxr

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2ECxxxxxxR Required Tools Safety Glasses Screwdriver #2 Phillips Screwdriver Roberson Rubber Mallet Hex Wrench Included Hardware Blum Connector Blum Connector Leveler “T” Nut Insert Flat Bracket Screw L005650060 (installed) L005650061 L007250037 L007250039 L005650025 NOTE: Open and assemble only one product at a time to avoid a potential mix-up of parts and hardware.
  • Page 48 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES LEFT HAND APPLICATION RIGHT HAND APPLICATION LEFT HAND RIGHT HAND LEFT HAND RIGHT HAND Back Panel Top Underside Page • globalcontract.com...
  • Page 49: L2Cc

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2CC Required Tools Safety Glasses Screwdriver #2 Phillips Screwdriver Roberson Rubber Mallet Hex Wrench Included Hardware Blum Connector Blum Connector Leveler “T” Nut Insert Flat Bracket Screw L005650060 (installed) L005650061 L007250037 L007250039 L005650025 NOTE: Open and assemble only one product at a time to avoid a potential mix-up of parts and hardware.
  • Page 50 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES LEFT HAND APPLICATION RIGHT HAND APPLICATION Corner Desk Inset Back Panel Corner Desk Full Back Panel Back Panel Top Underside Page • globalcontract.com...
  • Page 51: L2Ccxxxxxx

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2CCxxxxxx Required Tools Safety Glasses Screwdriver #2 Phillips Screwdriver Roberson Rubber Mallet Hex Wrench Included Hardware Blum Connector Blum Connector Leveler “T” Nut Insert Flat Bracket Screw L005650060 (installed) L005650061 L007250037 L007250039 L005650025 NOTE: Open and assemble only one product at a time to avoid a potential mix-up of parts and hardware.
  • Page 52 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES LEFT HAND APPLICATION RIGHT HAND APPLICATION Corner Desk Inset Cut Back Panel Corner Desk Cut Back Panel Back Panel Top Underside Page • globalcontract.com...
  • Page 53: L2Ck

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2CK Required Tools Safety Glasses Screwdriver #2 Phillips Screwdriver Roberson Rubber Mallet Hex Wrench Included Hardware Blum Connector Blum Connector Leveler “T” Nut Insert Flat Bracket Screw L005650060 (installed) L005650061 L007250037 L007250039 L005650025 NOTE: Open and assemble only one product at a time to avoid a potential mix-up of parts and hardware.
  • Page 54 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES LEFT HAND APPLICATION RIGHT HAND APPLICATION Corner Desk Inset Back Panel Corner Desk Full Back Panel Back Panel Top Underside Attach and assemble the keyboard mechanism as in- structed by the directions included in the packaging. Page •...
  • Page 55: L2Chk

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2CHK Required Tools Safety Glasses Screwdriver #2 Phillips Screwdriver Roberson Rubber Mallet Hex Wrench Included Hardware Blum Connector Blum Connector Leveler “T” Nut Insert Flat Bracket Screw L005650060 (installed) L005650061 L007250037 L007250039 L005650025 NOTE: Open and assemble only one product at a time to avoid a potential mix-up of parts and hardware.
  • Page 56 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES LEFT HAND APPLICATION RIGHT HAND APPLICATION Corner Desk Inset Cut Back Panel Corner Desk Cut Back Panel Back Panel Top Underside Attach and assemble the keyboard mechanism as in- structed by the directions included in the packaging. Page •...
  • Page 57: L2Tdhxxxxxx

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2TDHxxxxxx Required Tools Safety Glasses Screwdriver #2 Phillips Screwdriver #2 Robertson Rubber Mallet Included Hardware Blum Connector Blum Connector Leveler “T” Nut Insert Flat Bracket Screw L005650060 (installed) L005650061 L007250037 L007250039 L005650025 NOTE: Open and assemble only one product at a time to avoid a potential mix-up of parts and hardware.
  • Page 58 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Page • globalcontract.com...
  • Page 59: L2Tdxxxxxx

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2TDxxxxxx Required Tools Safety Glasses Screwdriver #2 Phillips Screwdriver #2 Robertson Rubber Mallet Included Hardware Blum Connector Blum Connector Leveler “T” Nut Insert Flat Bracket Screw L005650060 (installed) L005650061 L007250037 L007250039 L005650025 NOTE: Open and assemble only one product at a time to avoid a potential mix-up of parts and hardware.
  • Page 60 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES End Panel for T-Base Aplications (D Table, P Table, and Axe Table) T Base End Panel for Hockey Shaped Tables Aplication LEFT APPLICATION RIGHT APPLICATION End Panel for Modesty Aplications Hockey Shaped Tables LEFT APPLICATION RIGHT APPLICATION Page...
  • Page 61: L2Tcdxxxxxx

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2TCDxxxxxx Required Tools Safety Glasses Screwdriver #2 Robertson Included Hardware Flat Bracket Wood Screw #8 3/4 L005650025 L007250032 NOTE: Open and assemble only one product at a time to avoid a potential mix-up of parts and hardware.
  • Page 62 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2FDxxxxxx Required Tools Safety Glasses Screwdriver #2 Robertson Included Hardware Wood Screw #8 3/4 L007250032 NOTE: Open and assemble only one product at a time to avoid a potential mix-up of parts and hardware. It is adviseable to assemble the unit on a carpet to avoid scratches.
  • Page 63: Dimension Chart

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Table Dimension Chart TTSQ - Flat Square Column Base FLAT SQUARE BASE SPREAD TOP SIZE 18” 24x24 18” 30x30 23” 36x36 23” 42x42 30” 48x48 FLAT SQUARE 40.5H BASE SPREAD TOP SIZE 18” 24x24 23”...
  • Page 64: Dimension Chart

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Table Dimension Chart LDRUM - Drum Base TD DRUM BASE SPREAD ROUND TOP SIZE 18” dia 30” dia 18” dia 36” dia 24” dia 42” dia 24” dia 48” dia 30” dia 54” dia 30”...
  • Page 65: Dimension Chart

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Table Dimension Chart LLTT -”TT” Table Leg with Bulletnose End LLT - “T” Table Leg with Bulletnose End LLT/LLTT W/BULLNOSE ENDS Tables up 96” Length Require 2 Bases BASE SPREAD TOP WIDTH 18” 26”...
  • Page 66: Dimension Chart

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Table Dimension Chart LELBA or LELB - Eliptical Base Min 15” Min 15” LELBA, LELB BASE SPREAD TOP WIDTH 18” 18” Elliptical Base 18” 36” 24” 30” 36” 36” 108” - 120” Min 15” Min 15”...
  • Page 67: Dimension Chart

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Table Dimension Chart LR - Rectangular Base Min 15” Min 15” 30” - 36” 18” Rectangle Base 108” - 120” Min 15” Min 15” 24” Rectangle Base 42” - 48” 108” - 192” Min 15”...
  • Page 68: Dimension Chart

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Table Dimension Chart LELBA or LELB - Elliptical Base Min 15” Min 15” 24” Elliptical Base 42” - 48” 30” Elliptical Base 108” - 192” Min 15” Min 15” 30” Elliptical Base 54” - 60” 36”...
  • Page 69: Dimension Chart

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Table Dimension Chart LELBA or LELB - Elliptical Base Min 18” Min 18” 24” Elliptical Base 42” - 48” 30” Elliptical Base 108” - 192” Min 18” Min 18” 30” Elliptical Base 54” - 60” 36”...
  • Page 70: Dimension Chart

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Table Dimension Chart LR - Rectangular Base Min 24” Min 24” 18” Rectangular Base 42” - 48” 24” Rectangular Base 108” - 192” Min 24” Min 24” 24” Rectangular Base 54” - 60” 30”...
  • Page 71: Dimension Chart

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Table Dimension Chart LR - Rectangular Base Min 18” Min 18” 24” Rectangular Base 42” - 48” 108” - 192” Min 24” Min 24” 30” Rectangular Base 54” - 60” 144” - 192” Min 24”...
  • Page 72: Dimension Chart

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Table Dimension Chart Wedge Table - Rectangular Base 30” Rectangular Base LR Base Min 18” Min 18” 36” Rectangular Base 24” Rectangular Base 60” 168” TELRR or TELLRS Base Min 24” Min 24” 30”...
  • Page 73 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Kadin Tables Required Tools Safety Glasses Allenkey 3/16” Rubber Mallet Drill Included Hardware 2 Way Connector 3 Way Connector 2 Way Connector 60 Degree Beam 1/4 -20- 0.5 Screw Plastic Support Diecast Support Slider Note: First assemble the depth, then assemble the width of the table.
  • Page 74 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Kadin Table 1 Piece top 2 Piece top Round top 3 Piece top Page • globalcontract.com...
  • Page 75: Flip Top Tables P

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Flip Top Tables Required Tools Safety Glasses Drill Measuring Tape Wrench Allenkeys Phillips Bit Spacer Block 3 9/16” x 1 7/8” (included) Pre Assembled Components Legs Cross Beam Cable Release/Support Beams Legs 1. Connect the leg to cross beam. 2.
  • Page 76: Fall

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Flip top table top 7. Connect the beams to the table top using the pilot 8. Position cable release mechanism in the center of the table 1” from the user edge holes provided. and screw into the underside of the top.
  • Page 77 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Optional Modesty Panel 1. Remove end cap and insert bolt into the inside slot. Use the rubber mallet to secure the end cap in original position. 2. Use the guide to position the bolt with washer and nut 1 7/8” from the end. Tighten nut in place.
  • Page 78 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Flip top tables 4. Unbolt the pre-installed foot from it’s column. Insert the slotted bolt in the channel. Reconnect the foot and column. Tighten the bolt with washer and nut 4 7/8” from the bottom at the foot connection. 7/8”...
  • Page 79 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES viceversa® Required Tools Safety Glasses Rubber Mallet Screwdriver Metal Pick Allenkeys Nylon Block Leg attachment to surface STEP 1: Place the worksurface on the fl oor upside down. IMPORTANT: Ensure there are no foreign items on the fl oor that could damage the fi nish of the surface.
  • Page 80 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Ganging Worksurfaces Any worksurface with a rectilinear edge may be ganged to another surface with a rectilinear edge. There are two scenarios involved. ganging surfaces The fi rst involves taking an already existing (installed) table, and ganging it to another, or several.
  • Page 81 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Wire Manager The wire manager can be installed either after the unit has been inverted and in posi- tion, or while the worksurface is upside down on the fl oor. worksurface is STEP 1: Orient the extruded PVC wire manager so the opening for the wires is facing upside down the back of the worksurface.
  • Page 82 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES WIre Management with Boulevard Viceversa tables can manage wires externally routed to and from our Boulevard panel system. STEP 1: With the tables adjacent to boulevard panels, power and communication can exit the Boulevard raceway directly into the horizontal wire management tray terminating at any location atop the worksurface.
  • Page 83 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES FreeFit Required Tools Safety Glasses Robertson Screwdriver Allenkeys Drill with Roberson Bit Warning leafl et and user manual should be left on the table after completed installation. globalcontract.com •Page...
  • Page 84 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Feet Assemble the feet on the columns. Tighten screws fi rmly. IMPORTANT: Make sure the correct screws are used. Using too long screws may destroy internal parts in the column. Screw Socket Round UNC 5/16- 18x5/8” Zn Crossbars Loosen screws to adjust crossbar length.
  • Page 85 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Sidebars Fasten sidebars in threaded holes on top of crossbars with countersunk screws. Various types of sidebars exist, some of which can be placed in optional positions. The holes closest to the ends of the sidebar are dedicated for fi xing of work top but any available hole can be used for this purpose.
  • Page 86 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES 3-Column 90° Telescopic Crossbars Attach the crossbars on the long side of the housings. Tighten screws fi rmly. IMPORTANT: Do not use the two middle holes of the crossbars. Do not insert any object in the two middle holes as this Screw socket CSK can damage electronic components.
  • Page 87 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Electrical 2-Column The handset is mounted at the front edge of the work top, screwed to the underside with screws supplied with the unit. Connect cables and power supply according to Power Supply D04 35V/2, 12A AC input 110-240V, 50-60Hz Cable USA 2-pol IEC C7 Cable LinBus iDrive ASM Light Handed w/Screws...
  • Page 88 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Jog Wheel Hadset Manual Use the 2 attached screws for fi xing to the ta-ble top. If the thick- ness of the table top is less than 18 mm please use shorter screws. In situation of sloped edges of the table top there could be need for a third fi...
  • Page 89 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Wheel Controls How to set memory: Upper limit: Units: Run/Drive the table to the position you will store, Set the upper limit if there are limited Choose between metric or imperial sitting or standing. space in height.
  • Page 90: L2Pbbfxx

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2PBBFxx Required Tools Safety Glasses #2 Screwdriver Roberson Included Hardware Leveler L007250037 NOTE: Open and assemble only one product at a time to avoid a potential mix-up of parts and hardware. It is adviseable to assemble the unit on a carpet to avoid scratches.
  • Page 91: L2Hhxxhxx

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2HHxxHxx • All Storage Hutches Required Tools Safety Glasses Screwdriver #2 Phillips Screwdriver #2 Robertson Rubber Mallet NOTE: Open and assemble only one product at a time to avoid a potential mix-up of parts and hardware.
  • Page 92 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Wall Mount Storage Licence wall mount overheads are shipped fully assembled. STEP 1: Placement on a wall, insure that the wall has load bearing capability. Hardware to attach to a wall is not provided as different hardware is required for Installed on the overhead different types of walls.
  • Page 93: L2B2Hxxxx

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2B2Hxxxx • Bookcase Required Tools Safety Glasses Screwdriver #2 Phillips Screwdriver #2 Robertson Rubber Mallet Included Hardware Connecting Dowel Connecting Cam “L” Bracket “L” Bracket Shelf Support Pin L004250004 L007250002 L005650065 L005650064 L007250013 NOTE: Open and assemble only one product at a time to avoid a potential mix-up of parts and hardware.
  • Page 94 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Page • globalcontract.com...
  • Page 95: L2Bc2Hx

    GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES L2BC2Hx • Corner Bookcase Required Tools Safety Glasses Screwdriver #2 Phillips Rubber Mallet Included Hardware Connecting Dowel Connecting Cam Glide Shelf Support “T” Nut Insert L007250039 NOTE: Open and assemble only one product at a time to avoid a potential mix-up of parts and hardware.
  • Page 96 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES Page • globalcontract.com...
  • Page 97 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES INSTALLATION GUIDELINES Grommet Cut Dimensions (inches) ESMR101A ESMRH101A 3.23 6.00 R0.50 R0.25 6.00 1.85 MSPDM ESMR201A ESMRH201A 7.73 R0.25 R0.50 5.95 2.72 6.00 LCTM101 ESMR202A ESMRH202A 8.60 R0.25 10.50 R0.50 4.80 6.00 LRTM101 ESMR203A R0.10 ESMRH203A...
  • Page 98 *Installation instruction is shown using BHV01 & BHV02 vertical wall rails from the Global Contract Boulevard price list. Equivalent wall mount brackets may be used as long as it uses standard 1” incremental slots STEP 1: Based on width of the tackboard, see example dimension, vertical Wall rails are to be attached to the wall.
  • Page 99 GLOBAL Contract • Fall 2017 INSTALLATION GUIDELINES LTB20 • Tackboard for wall mounted installation, side by side LTB20XX BHV01 LTB20XX BHV02 BHV01 globalcontract.com •Page...
  • Page 100 GLOBAL Contract • July 2012 GLOBAL GLOBAL Contract Contract • June 2016 • Fall 2017 THE GLOBAL GROUP SHOWROOM 1350 Flint Road, Toronto, Ontario, M3J 2J7 Sales & Marketing • TEL: 1-877-446-2251 • FAX: 416-667-0338 Customer Service • TEL: 416-739-5000 • FAX: 800-361-3182 VANCOUVER SHOWROOM 3823 Still Creek Avenue Burnaby, BC, V5C 4E2 •...

Table of Contents