Download Print this page

Global Contract Corby Installation Manual

Descor collection

Advertisement

Quick Links

Corby
Installation Manual
Descor Collection
REVISED: JANUARY 2018
Visit us on the Internet at globalcontract.com • (905) 470-0010
ISO 9001:2008
ISO 14001:2004
201 8
Descor Industries Inc. 15 Riviera Drive
Markham, Ontario, L3R 8N4

Advertisement

loading
Need help?

Need help?

Do you have a question about the Corby and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Global Contract Corby

  • Page 1 201 8 Corby Installation Manual Descor Collection Descor Industries Inc. 15 Riviera Drive REVISED: JANUARY 2018 ISO 9001:2008 ISO 14001:2004 Markham, Ontario, L3R 8N4 Visit us on the Internet at globalcontract.com • (905) 470-0010...
  • Page 2: Product Installation

    ARxx32 & APxxHB32 - Peninsula table with high base (HB) pedestal 32”D ASxx & ACxxLB/ACxxHB - Stack-on bookcase with credenza Please contact your Global Contract Service Representative at (905) 470 - 0010 for any questions or concerns. NOTE: Any alterations to listed components will void the manufacturer’s warranty.
  • Page 3 FH screws (1/4-20 x 3/4, Qty. 20). STEP 3: Flip the assembled table upright. Adjust the glides to level the worksurface. NOTE: Occasional tables and Freestanding work tables have four legs. Peninsula tables have two legs. globalcontract.com • Corby • Page...
  • Page 4: Modesty Panel

    Align the modesty panel 6” inset from the edge and ensure equal spacing on surface of the table. either side. 6” inset BOTTOM VIEW STEP 5: Flip the assembled table upright. Adjust the glides to level the worksurface. Page • Corby • globalcontract.com...
  • Page 5 (at least one minute for the pressure sensitive double sided tape to adhere). FLUSH CONFIGURATION OFFSET CONFIGURATION STEP 5: Adjust the glides to level the assembled unit. (Configuration shown for outside riserbox opening) FLUSH CONFIGURATION OFFSET CONFIGURATION globalcontract.com • Corby • Page...
  • Page 6 , Qty. 2) through the bottom of the pedestal top. FLUSH CONFIGURATION OFFSET CONFIGURATION STEP 5: Slide the drawers back into the pedestal (if any). Adjust the glides to level the assembled unit. FLUSH CONFIGURATION OFFSET CONFIGURATION Page • Corby • globalcontract.com...
  • Page 7 STEP 6: [OPTiONal] To further secure stack-on bookcase, optional one minute for the pressure sensitive double sided tape to adhere). L-bracket may be installed using screws (#8 x 5/8, Qty. 8) STEP 7: Re-level the unit if necessary. globalcontract.com • Corby • Page...
  • Page 8 1310 Hollis Street, Suite 150, Halifax, NS, B3J 3P3 • TEL: 902-422-7434 QUEBEC SHOWROOM Complex Lebourgneuf 2, 815, boul. Lebourgneuf, Suite 502, Quebec, QC, G1V 3V9 • TEL: 418-653-6111 Please call ahead to book an appointment. Descor Collection Visit us on the Internet at globalcontract.com Page • Corby • globalcontract.com...