Download Print this page

Advertisement

Quick Links

Viceversa Bridges
Installation Manual
OHSAS 18001:2007
CGSB #0HS-009
Visit us on the Internet at globalcontract.com • (416) 739-5000
®
ISO 9001:2008
ISO 14001:2004
CGSB #94613-5
CGSB #EMS-040
2011
Global Contract Inc. 565 Petrolia Road
North York, Ontario, M3J 2X8

Advertisement

loading
Need help?

Need help?

Do you have a question about the Viceversa Bridges and is the answer not in the manual?

Questions and answers

Summary of Contents for Global Contract Viceversa Bridges

  • Page 1 2011 Viceversa Bridges ® Installation Manual Global Contract Inc. 565 Petrolia Road OHSAS 18001:2007 ISO 9001:2008 ISO 14001:2004 CGSB #0HS-009 CGSB #94613-5 CGSB #EMS-040 North York, Ontario, M3J 2X8 Visit us on the Internet at globalcontract.com • (416) 739-5000...
  • Page 2 Adaptor utes or less VERSION 2 03/18/10 Please contact your Global Contract Service Representative at 416-739-5000 for any questions or concerns. NOTE: Any alterations to listed components will void the manufacturer’s warranty. turer’s specifications. In accordance with the manufacturer’s policy of continual...
  • Page 3: Legs And Beams

    Contract GLOBAL • Spring 2011 INSTALLATION GUIDELINES Supporting Structure Height Adjustment Legs are connected with supporting beams. There is one beam for a single To connect a beam to a leg, identify the correct type (Standard or Interconnect) first - line of tables while two beams connect back-to-back table structures.
  • Page 4: General Information

    GLOBAL Contract • January 2010 GENERAL INFORMATION 120º Beam Support Designed to connect “A” frame legs with 120º “corner” leg to form support for a single table, or for adjacent table assemblies. The integrated 120ª beam bracket allows for the beam to be mounted in two positions: A) end of run leg placement B) shared leg placement Identify the desired leg position (A or B)
  • Page 5: Sliding Return

    Contract GLOBAL • January 2010 GENERAL INFORMATION 3” 3” Sliding Return Ensure that back-to-back table installation is complete, level and structurally sound. Installation of Sliding Rail requires a special degree of accuracy of work surface alignment. Failure to do so may result in binding of the sliding mecha- 3”...
  • Page 6 GLOBAL Contract • Spring 2011 INSTALLATION GUIDELINES Table Supports ROUND TABLE SUPPORT Round table structure consists of one main leg and two individual legs. STEP 1: Position each individual leg’s end bracket over the main leg’s horizontal, rectangular tube. STEP 2: Secure top and bottom bracket ends with the supplied screws. Level the whole assembly.
  • Page 7 Contract GLOBAL • Spring 2011 INSTALLATION GUIDELINES Cantilevers for Glass Tops Cantilever/Glass Tops Designed to provide support to either single or multiple glass work surfaces. Size of the cantilever corresponds with the depth of glass worksurface (24” and 30”). Begin by assembling table leg/beam structure as described previously and level the complete support assembly.
  • Page 8 GLOBAL Contract • Spring 2011 INSTALLATION GUIDELINES Doc-it Powered Rail Ensure Back-to-Back table installation is perfectly level. Refer to “Doc-it Installation STEP 5: Install remaining support brackets. Rail supporting brackets can be shared by Manual” to assemble the first rail, including duplexes, internal junction box and base two rails.
  • Page 9 Contract GLOBAL • Spring 2011 INSTALLATION GUIDELINES Power Trough Supporting Structure STEP 1: Install four brackets (two pairs of left and right brackets are required). Ensure that tab “A” fits over the rectangular VV2DL leg horizontal cross member. Use tab “B” to locate the bracket against the VV2DL leg worksurface bracket as illustrated.
  • Page 10 GLOBAL Contract • Spring 2011 INSTALLATION GUIDELINES Power Trough Electric Components Identify type and location of required electric components and position STEP 8: Secure all Power Troughs with supplied knurled thumb nuts. them in accordance with lay-out plans. STEP 9: Connect Power Distribution Housings and Jumper Harnesses on STEP 5: Secure Power Feed to the Power Trough brackets (ensure that the the ground, just below their future location.
  • Page 11 Contract GLOBAL • Spring 2011 INSTALLATION GUIDELINES Power Trough Electric Components : Continued STEP 11: Secure interconnected Electrical Components to Power Troughs: STEP 15: Repeat steps 13 and 14 under the opposite Duplex Receptacle. Proceed Proceed from the Power Feed by connecting its harness to the Power Distribu- to the opposite end of Power Distribution Housing.
  • Page 12 GLOBAL Contract • Spring 2011 INSTALLATION GUIDELINES Glazed Table Divider 36”, 42” and 48” wide dividers have 2 brackets, all others have 3. STEP 1: Install mounting brackets along the bottom edge of the divider (two upper screws provide “clamping power” while the central set screw adjusts clamping angle). STEP 2: Ensure that the brackets are perfectly perpendicular to the divider.
  • Page 13 Contract GLOBAL • Spring 2011 GENERAL INFORMATION Dividers Table Hung This divider secures to the rear edge of a table and serves as a privacy/modesty panel. STEP 3: Engage key holes in the mounting bracket with the screws and tighten. Pre-assemble the divider and mounting brackets: STEP 4: Have two people hold the divider bracket against bottom of the table work- surface while a third person secures the brackets with screws.
  • Page 14: Modesty Panel

    GLOBAL Contract • Spring 2011 INSTALLATION GUIDELINES Modesty Panel This modesty panel secures to the bottom of table worksurface. Place table upside down on a clean surface. STEP 1: Place the Modesty Panel on the reverse surface, with short lip pointing towards the centre of the table.