Installation - P. Energy L150A User And Maintenance Handbook

For photovoltaic panels with maximum dimension 1500x1000mm
Table of Contents

Advertisement

......................................................

INSTALLATION

3.
3.1.
INTRODUCTION
The laminator is delivered to the customer as agreed upon contract.
Before proceeding to the positioning of the machine, check the general status and the correspondence as described on the transport
document
IMPORTANT: FOR EVERY PROBLEM RISCONTRATO CONTACT IMMEDIATELY THE MANUFACTURER
3.2.
FOUNDATIONS
The laminator must stand an a solid, well leveled floor.
The client must check load bearing capacity (especially if on raised floors), and that the fixing used for the foundation fixing bolts of good
quality.
3.3.
EQUIPMENT FOR LIFTING AND TRASPORTING
It is the responsibility of the client to obtain all the equipment necessary for lifting and moving the laminator.
We recommend that the movement are make by a lift trucks, following this instructions.
a)
Use a right lift truck has a load capacity suitable for the weight of the machine to be moved
b)
The forks lift truck 's extensioned clamp must have the same length of the machine
c)
Place the forklift truck 's extensioned clamp between the base and the
d)
Move the machine to the place of installation, taking care to fix the
e)
If the machine must work in line with other production plant, it is important to make sure it is positioned correctly in line with the
line
f)
Check the level of the machine on the various sides
NOTE: The operations of lifting and moving the laminator must be carried only by allocated personnel who have been suitably trained in the
operations of lifting and moving the machine.
P.Energy
P.Energy
P.Energy
P.Energy
USER AND MAINTENANCE HANDBOOK L150A
Adjustable feet
Mobile arm of operator panel
11 - 30

Advertisement

Table of Contents
loading

Table of Contents