Maintenance ....................12 The Air Measuring Station (AMS050) is designed to be used in any application that requires accurate airflow measurement at velocities between 300 and 5,000 feet per minute (1.5 and 25 m/s).
The Digital Control unit is typically shipped loose in a NEMA 1 electrical enclosure and must be installed within 100 feet (30.5m) of the AMS050 in an environmentally controlled space. A wiring schematic label is located on the cover plate for future reference and in this document.
(model AMS070V). A control signal equal to the desired air flow (reference sample I/O chart on Page 10), is sent to the AMS050 control panel. The microprocessor compares the setpoint input signal with the actual flow and positions the damper actuator to maintain the specified CFM.
For other settings and pressure ranges consult transducer product data sheet Notice: The AMS050 is available with multiple control solutions. If the AMS050 unit on you project has something other than the solutions specified in this document, consult your local representative or the company that provided this air measurement station.
1. The controller enclosure should be mounted securely on an adjacent wall or attached to the air handling unit. The panel should be mounted within 100 feet (30.5 m) of the AMS050 to assure proper pressure signal function. If the enclosure must be mounted more than 100 feet (30.5 m) from the AMS050, please consult your local Ruskin representative or the company that you purchased the device from.
Apply a clean pressurized air source to the air piping connections at the AMS050 frame in order to blow out the sensing ports in the fixed sensing blades of the AMS050. DO NOT connect this air source to the pressure transducer or control modules. This will damage the instruments.