Rhopoint Optimap PSD Operating Instructions Manual page 12

Table of Contents

Advertisement

The display will change to -
During this step it is essential that the Optimap is left on the surface being measured
as it optimises the optical configuration using the reflected light from the surface.
Failure to observe this will result in the Optimap making incorrect measurements.
Once completed the screen will return to the main measurement screen with the
project name entered being displayed in the Project Name indicator.
Returning to the Project Screen other functions can be performed -
New Project
Open Project
Transfer Project
Exit
Up / Down
Selection
Delete Project
Project name
11

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Optimap PSD and is the answer not in the manual?

Table of Contents