Download Print this page

Advertisement

Quick Links

Congratulation on your purchase of Premio DSS424S-UN Storage Server System!
1.
Check the Content
your package contains the following:
#
Description
1
DSS424S-UN
Enclosure
2
Motherboard
3
CPU and memory
4
IO Cards
5
Heatsink
6
Slide Rail Kit + Screws
7
Power Cable*
8
Serial Cable*
* Inside the accessories box. Box may consist of screw sets for rail kit or
drives. If any items are missing, please contact your reseller or sales rep.
2.
Get Familiar with the Unit.
DSS424S-UN is a redundant server supporting dual Intel
processor with a front tray-less 24x 3.5" HDD storage, and
rear low-profile IO cards in a 4U space. Two Gigabyte
motherboards
(MZ31-AR0)
preinstalled. IO cards, CPU, and memory are preinstalled
upon request.
Front View of the Unit
Rear View of the Unit
Installation and service of this product should be conducted by a trained
personnel to avoid bodily injury from electric shock or heavy object
DSS424S-UN Quick Guide
Version 1.00 – 2017.10.12
of the box. Please confirm that
Image / Description
Gigabyte MZ31-AR0
AMD Epyc CPU and DDR4
and
internal
cabling
3.
Install 3.5" Drives
suggested to install HDDs after the unit is mounted to the
Qty
rack.
1
2
Opt.
Opt.
2
1 set
2
1
4.
Remove the Controller Node
components required (IO cards, mezzanine, CPU, memory).
are
5.
Inspect the Controller Node
comprise of a Gigabyte motherboard, an expander board, IO
card, an NTB retimer board, NTB switch board, power board,
4x internal fan modules (all connected to the motherboard).
Observe ESD (Electrostatic Discharge) practices during integration to avoid
possible damage to the board and / or other components
to the unit as illustrated. It is
to install any
.
The components

Advertisement

loading
Need help?

Need help?

Do you have a question about the DSS424S-UN and is the answer not in the manual?

Questions and answers

Summary of Contents for Premio DSS424S-UN

  • Page 1 DSS424S-UN Quick Guide Version 1.00 – 2017.10.12 Congratulation on your purchase of Premio DSS424S-UN Storage Server System! Check the Content of the box. Please confirm that Install 3.5” Drives to the unit as illustrated. It is your package contains the following:...
  • Page 2 For a complete instruction on how to install unit to the rack, please follow the Slide Rail Installation Guide. At least two people are recommended for mounting process. Insert HDDs after unit is mounted. For more information please visit our website at www.premioinc.com Copyright © 2017, Premio Inc. All rights reserved.
  • Page 3 115200, 8, N, 1, N. Refer to User’s Manual for further detail and how to set up Ethernet Management Port. For more information please visit our website at www.premioinc.com Copyright © 2017, Premio Inc. All rights reserved.