Power On (Ac Power); Power Failure (Ac Power) - D-Link DGS-1510-20 Hardware Installation Manual

Dgs-1510 series gigabit ethernet smartpro switch
Hide thumbs Also See for DGS-1510-20:
Table of Contents

Advertisement

DGS-1510 Series Gigabit Ethernet SmartPro Switch Hardware Installation Guide
can be uplinked with various other switches across a gigabit network. The SFP ports support data
rates of up to 1Gbit/s and the SFP+ ports support data rates of up to 10Gbit/s.
See the figure below for installing the transceiver in the transceiver port on the Switch.
For a full list of supported transceivers, compatible with this switch series, refer to Port Functions.

Power On (AC Power)

Plug one end of the AC power cord into the power socket of the Switch and the other end into the
local power source outlet. After the system powered on, the LED's blink green to indicate that the
system is booting up.

Power Failure (AC Power)

In the event of a power failure, just as a precaution, unplug the power cord from the Switch. After the
power returns, plug the power cord back into the power socket of the Switch.
Figure 2-4 Inserting fiber-optic transceivers into a Switch
NOTE: Only use pluggable optical modules and Direct-Attach Cables (DAC) that meet
the following regulatory requirements:
Class 1 Laser Product
UL and/or CSA registered component for North America
FCC 21 CFR Chapter 1, Sub-chapter J in accordance with FDA & CDRH
requirements
IEC/EN 60825-1/-2: 2007 2nd edition or later, European Standard
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents