Mitsubishi Electric MJ-310E Operation Manual page 22

Air conditioning control system
Table of Contents

Advertisement

Note:
- For a description of the underlined part, see par. "6.0 (2) Select the operation object" to be operated.
6) Select Paste
When Paste is selected from the menu, the schedule is pasted.
The schedule can also be pasted to other groups, blocks, or floors.
(2) Schedule check
Today's and yesterday's schedules of the group can be checked.
Operable objects: Floor, block, whole building
[Procedure]
1) Select Monitor/Operation
When the Monitor/Operation function select button is clicked, the moni-
tor/operation screen opens.
2) Select the object whose schedule is to be checked
Click the object whose schedule is to be checked.
When the cursor is set to Schedule of the displayed menu, a schedule
menu appears.
Note:
- For a description of the underlined part, see par. "6.0 (2) Select the opration object" to be operated.
3) Select Schedule view
When Schedule view is selected from the menu, the schedule check
screen opens.
Note:
- When batch schedule check was performed for two or more groups, [**] is displayed at the days with duplicate settings.
The schedule check screen also has a function that outputs the schedule to the screen.
Schedule output
[Procedure]
1) Select Output
Click the Output button on the schedule check screen.
(Click the Cancel button to end the schedule check screen without out-
putting the schedule.)
2) Select the output type
Click Printing output or File exporting.
For File exporting, input the filename. The save location can also be ref-
erenced by Reference button.
3) Select Output or Cancel
When the contents to be output are set, click the Output button.
Output: Accepts the changes and outputs the schedule and returns to
the preceding screen.
Cancel: Ignore the changes and returns to the preceding screen.
20

Advertisement

Table of Contents
loading

Table of Contents