Installation - Siemens SIMATIC PP7 Equipment Manual

Hmi push button panels
Table of Contents

Advertisement

Installation

Degree of Protec-
tion
Caution
!
PP7, PP17-I, PP17-II Equipment Manual
Release 06/98
www.gkbpx.com
The Push Button Panel must be brought to room temperature before it is
commissioned. If condensation forms, do not switch the Push Button Panel
on until it is absolutely dry.
To prevent the Push Button Panel overheating during operation, ensure the
air vents in the housing are not covered following installation.
The Push Button Panel was function-tested before shipping. If a fault oc-
curs however, please enclose a full account of the fault when returning the
unit.
该文档是极速PDF编辑器生成,
如果想去掉该提示,请访问并下载:
http://www.jisupdfeditor.com/
4
4-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simatic pp17-iSimatic pp17-ii

Table of Contents