The Check Strip Test
MATERIALS
REQUIRED:
Ascensia E
•
LITE
Ascensia E
•
LITE
Check Strip
CHECK THE METER:
4
™ Meter
™
1
Remove the Check
Strip from its package.
*A full display, as shown here, indicates that
all characters in the display are working
properly. If ever all the display segments do
not appear, see Section 6, page 32.
SECTION 1
2
Insert the Check Strip
fully into the Meter as
shown (with tab pointing
right). A beep sounds and a
full display* appears.
Another beep sounds and the
Check Strip test result is dis-
played. A check mark ( )
shows on the display when
the Check Strip test is done.