Connections To The Controller - Beijer Electronics BoX2 pro Installation Manual

Hide thumbs Also See for BoX2 pro:
Table of Contents

Advertisement

Installation
2. Connect the cables in the specified order, according to the drawing and steps
below.
Caution:
The operator panel must be brought to ambient temperature before it is started
up. If condensation forms, ensure that the operator panel is dry before connecting
it to the power outlet.
Ensure that the operator panel and the controller system have the same electrical
grounding (reference voltage level), otherwise errors in communication may
occur.
Ensure that the voltage and polarity of the power source is correct.
Separate high voltage cables from signal and supply cables.
Shielded communication cables are recommended.
RS232/
RS422/
RS485
C
Ethernet
The image is illustrative only and may differ slightly from the actual panel.
Connect cable A.
Connect cable B, using 14-20 AWG (2.08–0.52 mm
torque.
Connect cable C.
Connect cable D. The recommended cross-section of the cable is 1.5
2
mm
.
2.1.1
For information about the cables to be used when connecting the operator panel to
the controller, please refer to the help file for the driver in question.
12
B
24V DC
D
A

Connections to the Controller

Power
Controller
24V DC
2
), 180–220 N-cm
Beijer Electronics, MAEN275

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BoX2 pro and is the answer not in the manual?

Questions and answers

Table of Contents