STEP 4
ONCE THE SLIDE BED, SUPPORT TUBES, AND SUPPORT BOARD ARE COMPLETELY IN THE CAVITY AND
SUPPORT POCKET, SECURE USING 3" SCREWS AT EACH OF THE PILOT HOLE LOCATIONS AS SHOWN.
REPEAT PROCESS FOR OPPOSITE SLIDE RAIL.
SCREW PFH 8x3
(19 PLCS)
10 FOOT SLIDE ASSEMBLY
SCREW PFH 8x3
(19 PLCS)
SCREW PFH
(38)
8x3