Before You Begin; Meter Overview - Siemens 9510 Installation Manual

Power meter
Hide thumbs Also See for 9510:
Table of Contents

Advertisement

Before You Begin

Meter Overview

Meter Front
Softkeys
Optical Port
Operational
Navigation
LEDs
Buttons
PROG
ESC
6
Before installing the meter, familiarize yourself with the steps in this guide and
read the safety precautions presented on the "Installation Considerations"
page.
D
ANGER
Do not power up the meter until the current and voltage wiring is completed.
Recommended Tools
Phillips screwdriver
Precision flat-head screwdriver
Wire cutters / stripper
Button
ESC
/
PROG
SELECT
Button
Front Panel Button Functions
: Press the
/
PROG
SELECT
mode. In Setup mode, press the
: Press the
(Escape) button to return to a higher menu or discontinue a
ESC
ESC
configuration change.
: Press the
NAVIGATION
increment / decrement numbers.
Press the
or
LEFT
RIGHT
: Press a
SOFTKEY
SOFTKEY
configure from the sub-menus.
Digital Inputs
DI8
DICOM
I/O Expansion
Card
Power
Supply
Form C
Digital Outputs
/
(program or select) button to enter Setup
PROG
SELECT
/
PROG
SELECT
/
arrow buttons to highlight menu items, or
UP
DOWN
arrow buttons to move to an adjacent digit.
button to select the parameter that you want to
Meter Back
Voltage and Current Inputs
Analog Inputs
Analog Outputs
DI6
DI5
DI4
DI3
DI1
AI4
AI3
AI2
AI1
DI7
DI2
DCD
TXD
RXD
_
G
L
+
N
Communications
Card
Digital
Form A
Inputs
Digital Outputs
button to accept changes.
A03
A02
AO1
AO4
TXD
C
C
OM
ARD
Ground
Terminal

Advertisement

Table of Contents
loading

This manual is also suitable for:

9610

Table of Contents