Every 1000 Hours Service - Komatsu PC210LC-6K Operation & Maintenance Manual

Hydraulic excavator
Table of Contents

Advertisement

24.7 EVERY 1000 HOURS SERVICE

Maintenance for every 100, 250 and 500 hours should be carried out
at the same time.
24.7.1 CHANGE OIL IN SWING MACHINERY CASE
The oil is at high temperature immediately after the machine
has been operated. Wait for the oil to cool down before carry-
ing out maintenance.
Container to catch drained oil: Min. 6.8 l capacity.
Refill capacity: 6.8 l (1.8 US gal, 1.5 UK gal).
1.
Set an oil container under drain plug
2.
Loosen drain valve
drain valve again.
3.
Remove dipstick
Add the specified amount of engine oil through gauge hole
For details of the oil to use, see 20. "USE OF FUEL, COOLANT AND
LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE".
4.
After refilling, install bleeding plug
5.
Wipe off oil on the dipstick with a cloth.
6.
Insert dipstick
into the gauge pipe thoroughly and then pull out it
again.
7.
When the oil level is between the H and L marks, on dipstick
normal. If the oil does not reach the L mark, add more oil through oil
filler
.
8.
If the oil level exceeds the H mark, drain the excess engine oil from
drain plug
, and check the oil level again.
WARNING
under the machine body.
under the body, drain the oil, then tighten the
and bleeding plug
.
.
24. SERVICE PROCEDURE
.
, it is
3-61

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc210Pc240lcPc240nlc-6k

Table of Contents