Boom-Arm Coupling Pin (1 Point); Arm Cylinder Rod End (1 Point); Bucket Cylinder Foot Pin (1 Point); Arm-Link Coupling Pin (1 Point) - Komatsu PC210LC-6K Operation & Maintenance Manual

Hydraulic excavator
Table of Contents

Advertisement

24. SERVICE PROCEDURE
5.

Boom-Arm coupling pin (1 point)

6.

Arm cylinder rod end (1 point)

7.

Bucket cylinder foot pin (1 point)

8.

Arm-Link coupling pin (1 point)

9.

Arm-Bucket coupling pin (1 point)

10. Link coupling pin (2 points)

11. Bucket cylinder rod end (1 point)

12. Bucket-Link coupling pin (1 points)
24.4.2 CHECK OIL LEVEL IN SWING MACHINERY
CASE, ADD OIL
The oil is at high temperature immediately after the machine
has been operated. Wait for the oil to cool down before carry-
ing out this check.
1.
Remove dipstick
2.
Insert dipstick
fully in the guide.
3.
When dipstick
is pulled out, if the oil level is between the H and L
marks of the gauge, oil level is proper.
3-48
WARNING
and wipe the oil from the dipstick with a cloth.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc210Pc240lcPc240nlc-6k

Table of Contents