Download Print this page
FlowCon FT.0.3 Installation And Operation Instruction

FlowCon FT.0.3 Installation And Operation Instruction

Ft series thermal actuators

Advertisement

Quick Links

FlowCon FT actuators
INSTALLATION AND OPERATION INSTRUCTION
FlowCon FT.0.2, FT.0.3 and FT.0.4 actuators
The actuator type FlowCon FT.0.2 is a thermal mo-
dulating actuator, NC. FlowCon FT.0.3 and FT.0.4 are
thermal ON/OFF actuators, NC.
Fitting the FlowCon FT actuator:
Actuators are supplied with a separate black colored
adaptor ring. First, screw on the adaptor ring finger
Figure 1
Removing the FlowCon FT actuator:
Actuators are equipped with a front push button to
activate the release mechanism. When pushed, the
actuator is released and can be removed from the
adaptor ring. A special feature on the FlowCon FT.0.2
will allow the actuator to become tamper proof as the
bush button can be removed for protection.
Installation of the FlowCon FT actuator:
To ensure that the valve is in an open position during
commissioning of the system, all mentioned actuators
will be delivered in a Normally Open position and re-
main in this position until they are electrically operat-
ed first time. FIRST TIME POWERING requires ope-
rating voltage applied for approximately 6 minutes.
1B95050 - P100006323
Denmark
Dubai
- 1 -
tight to the connection thread at the top of the insert.
Do not use additional tools (figure 1,
FlowCon FT.0.2 connect the cable before fitting the
actuator on to the adaptor ring. FlowCon FT.0.3 and
FT.0.4 comes with fixed cable and can be fitted im-
mediately onto the adaptor ring (
indicate that the actuator is fitted correctly (
Upside down installation is allowed for all FT-actua-
tors along with the standard horizontal and vertical
installation (figure 2).
Figure 2
360º
USA
Brasil
FlowCon International assumes no responsibility for mistakes, if any, in any printed material.
THERMAL ACTUATORS
and
). A click noise will
>click<
Singapore
). For
).
.
03/2014

Advertisement

loading

Summary of Contents for FlowCon FT.0.3

  • Page 1 FIRST TIME POWERING requires ope- rating voltage applied for approximately 6 minutes. Denmark Dubai Brasil Singapore 1B95050 - P100006323 03/2014 - 1 - FlowCon International assumes no responsibility for mistakes, if any, in any printed material.
  • Page 2 Power 24V AC Ground/common FT.0.3 / FT.0.4 Actuator Close Open 24V AC/DC Power 230V AC Ground/common Denmark Dubai Brasil Singapore 1B95050 - P100006323 03/2014 - 2 - FlowCon International assumes no responsibility for mistakes, if any, in any printed material.

This manual is also suitable for:

Ft.0.2Ft.0.4