2.- INSTALLATION

2.1.- PRELIMINARY PREPARATIONS.

When unpacking the machine, have a correct segregation of non-hazardous waste coming from packaging: Plastic fi lm or other plas-
tic elements, metal strips, wood and pallets, through authorized dealers, or segregate
them in the containers destined for this purpose
Follow the installation instructions established in this manual to avoid disturbing noise caused by movement or shocks due to defi -
cient installation of the unit.
The unit must be transported in a VERTICAL POSITION on its metal mounting frame. Any other position may
cause serious damage to the machine.
When the unit is received, it should be checked to assure that it has received
no shocks or other damage, following the instructions on the packaging. If there is damage, the unit may be rejected by notifying
the LENNOX Distribution Department and stating why the machine is unacceptable on the transport agent's delivery note. Any later
complaint or claim made to the LENNOX Distribution Department for this type of damage cannot be considered under the Guarantee.
The modifi cations that the customer makes in the units will be under his responsibility and in this case, the declaration of conformity
certifi cate of Lennox manufacturer will not be valid.
Suffi cient space must be allowed to facilitate installation of the unit.
When positioning the unit, be sure that the Rating Plate is always visible since this data will
be necessary to ensure correct maintenance.
The units are designed to be installed with ducts designed by qualifi ed technical staff.
The joints to be used between ducts and openings in the unit should be Elastic Joints.
Avoid the use of BYPASS joints between the extraction air and input air.
The structure where the unit is placed must be able to support the weight of the unit during operation.
Defrosting: To avoid ice accumulation in the driptray , it may be necessary to install an electrical
heater and inside the drainage connection , to drain correctly the water. The drainage must be always
accessible through the indoor part , in order to remove easily the dirty than may be accumulated.

2.2.- UNIT ACCEPTANCE.

Outdoor and packaged units are placed on wood pallet for transportation.
The indoor units have with metal legs which must be removed when positioning the unit
How to hoist the unit
Use forklift for unloading and placement the unit. The unit is not suitable for lifting with crane.
• 25 •
All INSTALLATION, SERVICE and MAINTENANCE work must be carried
out by QUALIFIED PERSONNEL.
Installation Manual • COMPACTAIR ADV IOM-MIL157E-0418