Starting The Ft-100/Ci Or Ft-170/Ci; Figure 3-1. Locating The Main Power Switch - Filtec FT-100 Operation Manual

Gama fill detector
Table of Contents

Advertisement

3.2

Starting the FT-100/CI or FT-170/CI

3.2.1 Steps
Operating the FT-100/CI and FT-170/CI
Document 40275-0913
Complete these steps to start the FT-100/CI or FT-170/CI.
1.
Turn on the main power switch
Result: The FT-100/CI or FT-170/CI begins its power up
sequence. The signal beacon flashes briefly and then turns
off.
1
2
3
No.
Description
1
I/O junction box.
If your FT-100/CI or FT-170/CI is equipped with an I/O junction
box, the main power switch is located on the front of this box.
2
Power on light
3
Main power switch
4
Main power switch, which is usually located under the operation
station (if your FT-100/CI or FT-170/CI does not have an I/O
junction box)
Figure 3-1.
Locating the Main Power Switch
2.
When the power up sequence is complete, press any key to
display the
MASTER
You are now ready to clear the current counters. For more
information, see
4
MENU.
Clearing the Current
Counters.
3-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ft-170Ft-100ciFt-170ci

Table of Contents