Klarstein 10031697 Manual page 20

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 14
EN
Step 9
Lift up the housing, let the 4 anchor bolts
on the ceiling to cross the corresponding
installation hole of the housing. Use 4 pcs
M8 screw with gasket to fix the housing
well, ensure the bottom of the hood is level
with the decorative plate bottom of the
ceiling. Meanwhile, pull the expansion
pipe outside.
Note: The expansion pipe must be fixed on
the housing firmly.
Step 10
Cut off the spare part of the anchor
bolts,then according to the opposite step of
taking off the lamp plate and switch panel
to install them back to the hood, close the
two inside chimney,installation done.
20

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents