Download Print this page

Cisco IR510 Hardware Installation Manual page 15

Wpan gateway and wpan range extender

Advertisement

IR510 WPAN Gateway and IR530 WPAN Range Extender Hardware Installation Guide
IR510 Installation
Figure 7
Installing the Ground Lug Screw
Power and Alarm Connector for IR510
IR510 requires DC power. You connect the DC power and alarm connections to the IR510 through the Power and Alarm Connector found
on the far-right front panel of the IR510 above the Reset Button.
Table 7 on page 16
shows the power and alarm connectors for IR510.
Figure 8
IR510 Power and Alarm Connector
I
(Figure
7). The power connector labeling is on the connector
15
(Figure
8).

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Ir530