Download Print this page
Heat Wagon VF900SC The Dragon Wagon Installation And Maintenance Manual

Heat Wagon VF900SC The Dragon Wagon Installation And Maintenance Manual

Self-contained construction heater

Advertisement

Quick Links

VF900SC
The "Dragon Wagon"
Self-Contained
Construction
Heater
Revision 10-12
Installation and Maintenance Manual
Please retain this manual for future reference.
C
CAUTION: Do not use this heater in a
space where gasoline or other liquids
having flammable vapors are stored.
342 N. Co. Rd. 400 East
Valparaiso, IN 46383
888-432-8924 • Fax 219-462-7985
www.heatwagon.com
US

Advertisement

loading
Need help?

Need help?

Do you have a question about the VF900SC The Dragon Wagon and is the answer not in the manual?

Questions and answers

Summary of Contents for Heat Wagon VF900SC The Dragon Wagon

  • Page 1 342 N. Co. Rd. 400 East Valparaiso, IN 46383 888-432-8924 • Fax 219-462-7985 www.heatwagon.com Installation and Maintenance Manual Please retain this manual for future reference. VF900SC The “Dragon Wagon” Self-Contained Construction Heater CAUTION: Do not use this heater in a space where gasoline or other liquids having flammable vapors are stored.
  • Page 2 If you need assistance or heater information such as an instruction manual, labels, etc., contact your local Heat Wagon dealer or the manufacturer. Fire, burn, inhalation, and explosion hazard. Keep solid combustibles, such as build- ing materials, paper or cardboard, a safe distance away from the heater as recom- mended by the instructions.
  • Page 3: Table Of Contents

    Parts Breakdown .........14-18 WARRANTY All new Heat Wagon and Sure Flame heaters and fans are guaranteed against defective materials and work- manship for one (1) year from invoice date.
  • Page 4: Specifications

    VF900SC 8.830 6.64 13.9 Riello 40F 20 4.5 GPH 60º B 4” Duct Outlet 2 - 20” Dia. Return Air Inlet 2 - 24” Dia. Thermostat (50’ cord) On/Off Pump Pressure Air Damper 3.5/5.0 Turbulator S P E C I F I C AT I O N S Trailer Generator Set DOT Approved...
  • Page 5: Set-Up Inspection & Towing

    SET-UP INSPECTION & TOWING INSTRUCTION PREPARING THE VF900SC FOR DELIVERY OR RENTAL The Heat Wagon VF900SC requires service as well as proper operation in order to provide the performance and safety for which it was designed. Never deliver or put a machine into service with known defects or missing instructions.
  • Page 6: Starting Procedures

    GENERATOR (NORMAL)
  • Page 7 GENERATOR...
  • Page 8 GENERATOR...
  • Page 9: Heater Starting Procdures

    HEATER STARTING PROCEDURES • CONFIRM THAT TRAILER IS POSITIONED CORRECTLY. • TO OBTAIN MAXIMUM FUEL UTILIZATION FROM TANK, THE TONGUE OF THE TRAILER SHOULD BE TILTED SLIGHTY TO THE GROUND. • AFTER SUCCESSFUL STARTING OF THE GENERATOR PLUG IN FUEL TANK IMMERSION HEATER (LOCATED NEAR FRONT OF TANK) •...
  • Page 10 These These Overheat...
  • Page 12: Preventive Maintenance

    PREVENTATIVE MAINTENANCE (Part# HWP24390)
  • Page 13: Troubleshooting For Heating Unit

    Troubleshooting for Heating Unit...
  • Page 14: Wiring Diagrams

    VF900 HEATED FILTER...
  • Page 20 ACCESSORIES PUMP PRESSURE GAUGE DUCTING #99AM003 #WD2025 - 20” x 25’...