Download Print this page

Dynojet POWER COMMANDER V Installation Instructions page 4

Fuel management device

Advertisement

FIG.D
FIG.E
17-027
www.powercommander.com
6
Plug the pair of PCV connectors in-line of the stock connectors (Fig. D).
7
Secure the PCV ground wire with the ring lug to the negative terminal of the
bike's battery.
8
Use the supplied Velcro to secure the PCV module in the tail section (Fig. E).
Clean the surface area with the supplied alcohol swab prior to applying the
Velcro.
9
Secure the front of the fuel tank and reinstall the seats.
Optional Inputs:
Speed - BLUE/YELLOW wire. Senor is located on the left hand side of the
engine case in front of the countershaft sprocket.
Temperature - BLUE/WHITE wire on the GREY 10-pin connector under the
fuel tank.
12v source for Auto-tune - RED wire of the taillight connector.
2006-2007 Kawasaki ZX-10R - PCV - 4

Advertisement

loading
Need help?

Need help?

Do you have a question about the POWER COMMANDER V and is the answer not in the manual?

Questions and answers