Dynojet PCV Installation Instructions
Dynojet PCV Installation Instructions

Dynojet PCV Installation Instructions

Fuel and ignition for ktm 250 xc-w 2012; ktm 350 xc-w 2012; ktm 450 xc-w 2012; ktm 500 xc-w 2012; ktm 250 xc-w 2013; ktm 350 xc-w 2013; ktm 450 xc-w 2013; ktm 500 xc-w 2013; ktm 250 xc-w 2014; ktm 350 xc-w 2014; ktm 450 xc-w 2014; ktm 500 xc-w 2014; ktm 2

Advertisement

FUEL AND IGNITION

FUEL AND IGNITION
2012-2016 KTM
250/350/450/500 XCW
I n s t a l l a t i o n I n s t r u c t i o n s
PLEASE READ ALL DIRECTIONS BEFORE STARTING INSTALLATION
I18-022.01
www.powercommander.com
2191 Mendenhall Drive North Las Vegas, NV 89081 (800) 992-4993 www.powercommander.com

PARTS LIST

1
Power Commander
1
USB Cable
1
Installation Guide
2
Power Commander Decals
2
Dynojet Decals
2
Velcro Strips
1
Alcohol Swab
3
Zip Ties
THE IGNITION MUST BE TURNED
OFF BEFORE INSTALLATION!
YOU CAN ALSO DOWNLOAD THE
POWER COMMANDER SOFTWARE AND
LATEST MAPS FROM OUR WEB SITE AT:
www.powercommander.com
2012-2016 KTM 250/350/450/500 XCW - PCV - 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PCV and is the answer not in the manual?

Questions and answers

Summary of Contents for Dynojet PCV

  • Page 1 POWER COMMANDER SOFTWARE AND LATEST MAPS FROM OUR WEB SITE AT: www.powercommander.com PLEASE READ ALL DIRECTIONS BEFORE STARTING INSTALLATION 2191 Mendenhall Drive North Las Vegas, NV 89081 (800) 992-4993 www.powercommander.com I18-022.01 www.powercommander.com 2012-2016 KTM 250/350/450/500 XCW - PCV - 1...
  • Page 2 I18-022.01 www.powercommander.com 2012-2016 KTM 250/350/450/500 XCW - PCV - 2...
  • Page 3 PCV wiring harness down the left side of the bike, following along the underside of the left frame rail as shown in Figure C. Using the supplied velcro, secure the PCV to the inside of the rear fender as shown in Figure C.
  • Page 4 The TPS is located on the left side of the throttle body. This connector has a rubber boot covering it that will need to be peeled back to unplug the connector. Attach the PCV connectors to the bike’s TPS and the stock wiring harness as shown in Figure F. I18-022.01 www.powercommander.com...
  • Page 5 Attach the PCV wiring harness spades in between the stock connectors as shown in Figure I. Using the supplied zip ties, secure the PCV wiring harness so it is free and clear of any hot or moving parts. Reinstall the fuel tank, the radiator shrouds on both sides, the left side panel, and the seat.

This manual is also suitable for:

Power commander v

Table of Contents