Celina PINNACLE SERIES Product Manual page 11

20’ x 40’ pinnacle series high peak frame tent 1 pc.
Table of Contents

Advertisement

Striking Instructions
1. Loosen all ratchet assemblies.
2. Remove anchoring pins from pinnacle base plates.
3. Remove ratchet assemblies attached to base plates.
4. Remove 3 legs from one side of the tent and carefully set the tent frame on the ground.
5. Remove the center mast assemblies
6. Remove opposite side legs.
7. Unfasten the corner straps, completely disconnecting the tent top from the frame and stakes.
8. Remove ratchet assemblies and carabiners.
9. Roll out a drop cloth next to the frame.
10. Carefully remove the tent top from the frame, lifting up on the fabric or "flapping" it to create a cushion of air.
11. Fold and roll the tent top as tight as possible. Remember not to stand or walk on the tent top fabric.
12. Bagging (always use a drop cloth to protect the tent top from dirt and abrasions while bagging):
a. For Wrap-Around Tent Bag:
i. Lay the bag next to the tent top with the side-release buckles facing down. Roll the tent top
onto the center of the bag.
ii. Connect the two short male and female side-release buckles; pull tight.
iii. Connect the remaining side-release buckle and pull tight.
b. For Round-Bottom Bag:
i. Place the folded tent top into the upright vertical position.
ii. Pull the round bottom tent bag over the upright tent top.
iii. Turn the tent top and bag over, pull the draw string tight and tie off.
13. Disassemble all cables and fittings. Work from the perimeter of the frame inward.
14. Fold and roll up the drop cloth.
15. Remove remaining stakes.
20' x 40' Pinnacle Series High Peak Frame Tent/Cross Cable Marquee
INSTALLATION INSTRUCTIONS
GetTent.com/CelinaTent.com/GetTent.co.uk
© 2018 Celina Tent Inc.
PG.11

Advertisement

Table of Contents
loading

Table of Contents