[Operating Test] Settings - LG ED05K000E00 Installation Manual

Energy storage system
Hide thumbs Also See for ED05K000E00:
Table of Contents

Advertisement

[Operating Test] settings

This is the last stage at setting process. Before operating this product, [Operating Test] must be done for
checking all the systems are ready to run. If [Operating Test] is not proceeded, this product does not work.
A
B
Tab [Operating Test] on [Installer Settings]. The operating test
menu is displayed.
You should perform 4 operating tests. To start the test, tab
[START] of each test. Start the tests one by one from left.
Charging (Grid to Battery) :
for battery charging through power grid.
Charging (PV to Battery) :
for battery charging through PV.
Discharging (Battery to Grid):
test for battery discharging to power grid.
Inverter (PV to Grid):
converting PV' s DC power to AC power.
The result is displayed when each test is completed. When
there is no problem with the test, [Success] is displayed. When
[Fail] is displayed, tab each test result to display the detailed
information. Check and solve the error referring to the error
code in the information, and perform the test again. For
information on the error code, refer to page 40.
Settings
The operating test
The operating test
The operating
The operating test for