Pentair SHURFLO WB6-M3-22-003-SS Manual page 7

Water boost modular filtration systems
Table of Contents

Advertisement

SYSTEM START-UP AND OPERATIONS CONTINUED
Plumbing Procedure
Please refer to the image below, as reference is made throughout this procedure to these components.
Ice Maker
Water Supply*
Main City
Water Inlet
City Water In
1
Ball Valve
Pressure Relief
2
Valve
*Ice Maker Water Supply is non-boosted/non-filtered
1. Position both inlet and outlet globe-valves to the
off position.
2. Connect incoming city water supply line to inlet
shut-off valve.
If icemaker is being installed, follow steps 3 and 4.
If icemaker is not being installed, proceed to step 5.
3. Remove plugged icemaker supply from line inlet
globe-valve.
4. Connect icemaker supply line to the inlet globe-valve.
5. Connect carbonator supply line to outlet globe-valve.
If installing non-carbonated valves on dispense unit
follow steps 6 and 7.
If non-carbonated valves are not being installed,
proceed to step 8.
6. Remove plugged non-carbonated supply line from outlet
of globe-valve.
7. Connect non-carbonated supply line to outlet of
globe-valve.
8. Install inline water pressure reducer valve just prior to the
inlet fitting of the carbonator pump.
Pentair
Shurflo
inline water pressure reducer valves
®
®
are recommended for all water boost modular system
installations. For additional information regarding the water
pressure reducer valve please refer to Pentair Shurflo
document 911-380.
9. Turn the purge valve to the off position.
SHURFLO WATER BOOST MODULAR FILTRATION SYSTEM INSTALLATION AND OPERATION GUIDE
Water Out
Water Out
to Carbonator
Non-Carb System
Filter Head
4
Assembly
WBMF System Out
3
Ball Valve
Ice Filter Canister
11
stainless steel sump
Bypass
5
Plug/Cap
10. Check pre-charge pressure of accumulator tank for
proper pressure – add additional pressure if required
using air only (do not pre charge accumulator with CO 2 ).
50 psi pre-charge pressure is recommended for carbonated
beverage installations.
11. Manually open and close pressure relief safety checking
for proper functioning.
12. Uncoil purge line and put into bucket or drain.
13. Turn on incoming city water supply and inlet globe-valve.
14. Outlet globe-valve should still be in the off position.
Inspect properly connected water supply line to icemaker.
15. Connect power supply to water boost pump.
16. Turn the purge valve to the open position.
17. Purge system until all air is evacuated and a steady water
flow is present.
18. Turn purge valve to the off position.
19. Recoil and secure purge line to system.
20. Allow water boost pump to cycle off
Please follow all Beverage OEM standard startup procedures
for carbonated system applications.
21. Check system for water leaks.
22. Turn the outlet globe-valve to the on position.
23. Check for proper operation of icemaker, carbonator and
non-carbonated dispense valve operation.
Tank Pre-charge
10
Valve and Cap
Booster Pump
9
(behind shroud)
Purge Valve
8
w/o drain tubing
attached
Filtered Water
7
Pressure Gauge
6
Filter Canister
stainless steel sump
(continued)
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Shurflo wb6-m3-22-003-ssplus

Table of Contents