4 Set-up
9
Flue pipe wall duct
A = see installation
template (60/100 mm
diameter air/flue pipe)
A = 235 mm
(80/125 mm diameter
air/flue pipe)
Consult the installation template that is supplied to find the
dimension A.
4.5
Minimum clearances
C
C
A
165 mm: Flue pipe, 60/100 mm diameter
275 mm: Flue pipe, 80/125 mm diameter
B
180 mm; optimum approx. 250 mm
C
5 mm; optimum approx. 50 mm
D
500 mm clearance in front of the heat generator
to enable easy access for maintenance work (the
same as a door opening).
4.6
Clearance from combustible components
It is not necessary to maintain a clearance between the
product and components made of combustible materials that
go beyond the minimum clearances (see page).
4.7
Using the installation template
▶
Use the installation template to ascertain the locations at
which you need to drill holes and make breakthroughs.
10
10
Product holder
11
R1 tundish/condensate
siphon connection
12
Flue pipe connection
D
Minimum clearance
4.8
Wall-mounting the product
1.
Check whether the wall has sufficient load-bearing ca-
pacity to bear the operational weight of the product.
2.
Check if the supplied fixing material may be used for
the wall.
Conditions: The load-bearing capacity of the wall is sufficient, The fixing
material may be used for the wall
▶
Wall-mount the product as described.
▶
Install the hanging bracket (1) on the wall.
▶
Hang the product on the product bracket from above
using the suspension bracket.
Conditions: The load-bearing capacity of the wall is not sufficient
▶
Ensure that wall-mounting apparatus on-site has a suf-
ficient load-bearing capacity. Use individual stands or
primary walling, for example.
▶
Do not wall-mount the product if you cannot provide
wall-mounting apparatus with a sufficient load-bearing
capacity.
Conditions: The fixing material may not be used for the wall
▶
Wall-mount the product as described using the adapted
fixing material provided on-site.
Installation and maintenance instructions ecoTEC sustain 0020253094_01
1