Battery Pack Charging - BRASSELER USA BSP MAX II Instructions For Use Manual

Four station modular battery charger, 4-bay power unit, 110/230v, standard battery pack charging bay
Hide thumbs Also See for BSP MAX II:
Table of Contents

Advertisement

Battery Pack Charging

1. Insert battery pack into a charging bay receptacle.
2. Follow warnings, cautions and notes in BSPMAX™ II
PM-X00-710 (9.6V) & PM-X00-715 (12V) Battery
Packs Instructions for Use.
3. A single light will illuminate to indicate battery pack
status.
• All pulse - System is powered on.
• Yellow (pulsing) - Primary diagnostic test to determine voltage level.
• Yellow (solid) - Battery Pack is charging.
• Green (solid) - Battery Pack is charged and ready for use.
• Red (pulsing) - Secondary diagnostic test to determine charging capacity.
• Red (solid) - Charging cycle failed and battery pack should be disposed of
properly (refer to Battery IFU for Product Disposal Information).
10
Battery
Pack
Charging
Bay
Receptacle
CHARGE (Yellow)
READY
(Green)
SERVICE (Red)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pm-x00-520Pm-x00-522Pm-x00-731

Table of Contents