Kohler Command Pro EFI ECH940 Service Manual page 92

Hide thumbs Also See for Command Pro EFI ECH940:
Table of Contents

Advertisement

Reassembly
Flywheel, Backing Shroud, and Baffl e Components
B
A
A
Barrel Baffl es
C
Rectifi er-Regulator
E
Flywheel
G
Flywheel Screw
I
Woodruff Key
92
A
C
F
D
I
G
E
B
Backing Shroud
D
Stator
F
Washer
Front Drive Shaft
H
(if equipped)
KohlerEngines.com
Install Backing Shroud
H
A
A
Backing Shroud
NOTE: New hose clamps are recommended for
reassembly, or if clamps have been loosened
(expanded) several times to avoid leakage.
1. To aid assembly, and if it was removed, install lower
oil cooler hose onto oil fi lter housing prior to
installing backing shroud assembly, and secure with
a clamp. Position clamp as noted in disassembly.
2. Install backing shroud assembly and secure to
crankcase with M6 screws. Torque screws, in
sequence shown, to 10.7 N·m (95 in. lb.) into new
holes, or 7.3 N·m (65 in. lb.) into used holes.
Install Barrel Baffl es
1. Position barrel baffl es and start each screw.
2. Torque M6 screws going into cylinder head and
crankcase to 10.7 N·m (95 in. lb.) for new holes, or
7.3 N·m (65 in. lb.) for used holes.
3. Torque M6 shoulder screws going through backing
shroud assembly into extruded holes in baffl es to
2.5 N·m (22 in. lb.) into new holes, or 2.0 N·m
(18 in. lb.) into used holes.
4. If removed, install ignition coils to barrel baffl es and
secure with clip and screw. Torque screw to 5.1 N·m
(45 in. lb.).
5. Connect wiring harness leads to ignition coils.
6. Install fuses into fuse holder covers on barrel baffl e.
B
3
1
2
4
B
Wiring Harness
62 690 13 Rev. A

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Command pro efi ech980

Table of Contents