Prerequisites - Dell Z9100-ON Installation Manual

Open networking
Hide thumbs Also See for Z9100-ON:
Table of Contents

Advertisement

Table 4. QSFP28 Port LEDs (4x25 GbE or 4x10 GbE Mode)
LED
Link LED
Activity LED
Table 5. SFP+ Port LEDs
LED
Link LED
Activity LED
Table 6. Stacking Port LEDs
LED
Stacking LED

Prerequisites

The following is a list of components required for successful installation of the Z9100-ON.
NOTE: Detailed installation instructions for the Z9100-ON are provided in
Install the
Z9100-ON.
Z9100–ON chassis (or multiple chassis, if stacking)
AC or DC cables to connect the AC or DC power source to each of the chassis' AC or DC power
supplies (country/regional specific)
Mounting brackets for rack installation (included)
Screws for rack installation
#1 and #2 Phillips screw drivers (not included)
Torx screwdriver (not included)
Ground cable screws (included)
Copper/fiber cables
Other optional components are:
Ground cable
10
Description
Off — No Link
Solid green — Port link is 4x25 GbE
Solid amber — Port link is 4x10 GbE
Off — No Link
Flashing green (~30 ms) — Port link is 4x25 GbE
Flashing amber (~30 ms) — Port link is 4x10
GbE
Description
Off — No Link
Solid green — Link operating at maximum port
speed
Solid amber — Link operating at lower speed
Off — No Link
Flashing green (~30 ms) — port activity
Description
Off — System I sthe Salve of the stack
Solid green — System is the Master of the stack
or a standalone unit
Site Preparations
and
The Z9100–ON System

Advertisement

Table of Contents
loading

Table of Contents