Figure 7. Two-Post Center-Mount Configuration
2.
Slide the back bracket towards the post and secure it to the post flange with two user-supplied
screws. See item 2.
3.
Repeat this procedure for the second rail.

Configuring a Four-Post Thread

To configure a four-post thread installation, follow these steps.
1.
For this configuration, remove the flange ear castings from each end of the ReadyRails assemblies.
To remove the two screws from each flange ear and remove each casting, use a Torx driver. See the
following illustration, item 1. Retain the castings for future rack requirements.
Install the Z9100–ON