Install The Z9100-On; Unpack The Z9100-On System - Dell Z9100-ON Installation Manual

Open networking
Hide thumbs Also See for Z9100-ON:
Table of Contents

Advertisement

Install the Z9100–ON
To install the Z9100–ON system, Dell Networking recommends completing the installation procedures in
the order presented in this chapter.
Always handle the Z9100–ON and its components with care. Avoid dropping the system or its field
replaceable units (FRUs).
This chapter describes the installation procedures as follows:
1.
Unpack the Z9100–ON System
2.
Install Rack or Cabinet Hardware
3.
Install the Z9100-ON System
4.
Install the SFP+ Optics
5.
Power Up the System
NOTE: ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist
or heel ground strap when handling the Z9100–ON and its components. As with all electrical
devices of this type, take all the necessary safety precautions to prevent injury when installing this
system.

Unpack the Z9100-ON System

NOTE: Before unpacking the system, inspect the container and immediately report any evidence of
damage.
When unpacking the Z9100-ON switch, make sure that the following items are included:
One Z9100-ON switch
One RJ-45 to DB-9 female cable
Two sets of rail kits (no tools required)
Two PSUs
Five fan units
One AC or DC power cord (country/region specific)
Dell Networking Getting Started Guide for the Z9100–Open Networking (ON) System
Safety and Regulatory Information
Warranty and Support Information
Install the Z9100–ON
4
15

Advertisement

Table of Contents
loading

Table of Contents